Laserfiche WebLink
<br />storm water <br />management plan <br />per Orange <br />County Drainage <br />Area Management <br />Plan (DAMP) that <br />includes all <br />structural and <br />non-structural <br />Best Management <br />Practices for <br />the project. <br /> <br />Submit and have <br />approved a <br />surface <br />drainage/utility <br />plan to include <br />all structural <br />Best management <br />Practices. <br /> <br />Provide two <br />copies of the <br />Water Quality <br />Management Plan <br />(WQMP) that <br />includes a <br />description of <br />all-applicable <br />Structural and <br />Non-Structural <br />Best Management <br />Practices, which <br />would apply to <br />this project. <br /> <br />Prior to the <br />issuance of <br />building <br />permits, the <br />applicant shall <br />prepare a <br />surface water <br />runoff study to <br />show existing <br />and proposed <br /> <br />Prior to <br />Building <br />Permit <br /> <br />Public Work.s <br /> <br />31A-67 <br /> <br />47 of 48 <br />