Laserfiche WebLink
<br /> Ci/ll Place Miligation MQnitoring Program <br /> MITIGA nON MONITORING PROGRAM FOR THE CITY PLACE PROJECT <br />-c;u <br />mro Mitigation Measure Implementation Responsible <br /><D.. <br />roo Schedule Deoartment <br />~c: <br />.þ.= AQ-5a After January I, 2005, no person shall conduct an active operation with a disturbed <br />00 <br />_:J surface area of five or more acres, or with a daily import or export of 100 cubic yards or <br />",,,, <br />",0 more of bulk material without utilizing at least one of the measures listed in <br />0 <br />'" subparagraphs (d)(5XA) through (d)(5)(E) at each vehicle egress from the site to a paved <br />, <br />o . public road. <br />~ - <br /><J) <br /> (A) 'Install a pad consisting of washed gravel (minimum.size: one inch) maintained <br /> in a clean condition to a depth of at least six inches and extending at least 30 feet <br /> wide and at least 50 feet long. <br /> (ß) Pave the surface extending at least 100 feet and at least 20 feet wide. <br /> (C) Utilize a wheel shaker/wheel spreading device consisting of raised dividers (rails, <br /> pipe, or grates) at least 24 feet long and 10 feet wide to remove bulk material <br /> from tires and vehicle undercarriages before vehicles exit the site. <br /> (D) Install and utilize a wheel washing system to remove bulk material from tires and <br /> vehicle undercarriages before vehicles exit the site. <br /> (E) Any other control measures approved by the Executive Officer and the U.S. EP A <br /> as equivaleut to the actions specified in subparagraphs (d)(5)(A) through <br /> Id1!5\(D). <br /> AQ-6 The project applicant will be required to name a construction relations officer to act as OJ <br /> community liaison concerning on site construction activity, including resolution of issues <br /> related to dust generation from grading/paving activitìes. <br /> AQ-7 The project shall comply with SCAQMD Rule 402 - Nuisances in the Siting of Trash <br /> Bins and Exhausts of Restauranl Cooking Fumes. <br /> Cull ural Resources <br /> C-l If buried cultural material is encountered during project construction, the construction During all site preparation, Executive Director of the <br /> contractor shall immedialely stop work and the City Environmental Coordinator shall be grading and construction. PBA or hislher designee. <br /> contacted for appropriate action. <br /> F:\PROJ-ENV\Ciry Place\RTC - Report\MWgatioll Monitoring Plan.doc MM-3 <br /> Januarv 2005 <br />