Laserfiche WebLink
<br /> -. <br /> Citv Place Milij{atÙJII MUflitorillg Prof:mm <br /> MITIGATION MONITORING PROGRAM FOR THE CITY I'LACE PROJECT <br />-a;tJ <br />'"<D Mitigation Measure Implementation Responsible <br />CD", <br /><DO Schedule Dcnartl11cnt <br />~C <br />0>'" b) Stockpiles of soil shall be properly contained to eliminate or reduce sediment <br />00 <br />~i transport from the site to d1C streets, drainage facilities or adjacent properties via <br /> nmofT, vehicle tracking or wind. <br /> c) Appropriate BMPs for construction-related materials, wastes, spills or residues shall <br />ë be implemented to mitúmize transport for the site to streets, drainage faeilities or <br /> adjoitúng properties. <br /> d) Runoff from equipment and vehicle washing shall be contained at construction sites <br /> unless treated to reduce or remove sediment and other pollutants. <br /> e) AU construction contractor and subcontractor personnel are to be made aware of the <br /> requ~ed BMPs and good housekeeping measures for the proje<:t site and any <br /> associated construction stnging areas. <br /> I) At the end of each day of construction activity, all construction debris and waste <br /> materials shall be collected and properly disposed of in trash or recycle bins. <br /> g) Any designated smoking area shaH have an <1ppropriatc cigarette waste receptacle <br /> Jhat is fitted to not allow cigarette butts to enter storm water or drains during raÎn or <br /> lùgh winds. All contractor and subcontractor personnel will be directed to dispose <br /> of cL2arette butts in these recentacles. <br /> For Post-Construction (WQMP): Prior to Ihe issuance of the Executive Director of the <br /> grading permit. PDA or his/her designee. <br /> W-4 Prior 10 finalizing design plans, a WQMP shall be prepared addressing post conslIUction <br /> starnl water runoff. This will consist primarily of structural BMPs addressing the. urban <br /> ronofT from the site. As part of Ule fuml design plans for Ule parking lo~ drainage for the <br /> parking area shall be filted with structural BMPs 10 reduce or eliminate urban runoff in the <br /> foml of catch basins wiU. filters (most likely Cossil) or oUler equivalent fi1tration device Umt <br /> arc regularly maintained and cleared so as to remain effective throughout the stann season. <br /> Regular clearing of large debris after a stann to shall be incorporated illto the ongoing <br /> maintenance program for Ule City Place project site. <br /> - <br /> F:\PROJ-ENVlCity PlocelRTC - ReportlMitigotion MOllitorillg PlolI.doc MM-5 <br /> .1(11"'(111' ?nn\ <br />