My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOYLE ENGINEERING 1 - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
BOYLE ENGINEERING 1 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 12:10:49 PM
Creation date
3/28/2005 3:19:41 PM
Metadata
Fields
Template:
Contracts
Company Name
Boyle Engineering Corporation
Contract #
A-2005-025
Agency
Public Works
Council Approval Date
2/7/2005
Insurance Exp Date
12/31/2005
Destruction Year
2012
Notes
Amended by A-2005-025-01; termination slip 12/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OIAZ.YOURMAN & ASSOCIATES (OYA) <br />SCHEDULE OF CHARGES. 2005 <br /> <br />Professional Services <br /> <br />Junior................................................................................................................... $87. OO/hour <br />Staff.................. .............................. ................ .............. ............ ............ ............... 101.00/hour <br />Project ............................................ ....................... ....... ............ ........................... 118.00/hour <br /> <br />Senior .............................. ............... ..... ................... ...... ........................ ......... ...... 135.00/hour <br />Associate...................... ........... .............. ................. ........................... ..... ....... ...... 152.00/hour <br /> <br />Principal. ..... .... ..... ....... .......... ............ ..... ..... ... ......... ........... ... ... ... ... .... ......... ..... .... 170.00/hour <br /> <br />Support Services <br />Word Processing/ClericaL...................................................................................... 53.00/hour <br /> <br />Drafting.................................................................................................................. 78. OO/hour <br />Technical Editing.................................................................................................... 73. OO/hour <br /> <br />Technician............................................................................................................. 58. OO/hour <br />Senior Technician.. ........ ............... ..... ..... .................... ........... ............... ....... .......... 85.00/hour <br /> <br />Prevailing Wage Field Services <br />Week Days (5 am to 5 pm) .................................................................................... 85.00/hour <br />Weekday Overtime (first 4 hours) ........................................................................ 102.00/hour <br />Week Nights (5 pm to 5 am), Saturdays (0 to 12 hours) ......................................102.00/hour <br />Sundays, Holidays, Other Overtime .....................................................................127.00/hour <br /> <br />Equipment <br /> <br />Truck..... ...... .... .... .... ... ... ........ ......... ........ ........ ... ... ... .............. ......... ...... ............ ...... 11.00/hour <br />Automobile............................................................................................................... 0.45/mile <br />Nuclear Gauge........................................................................................................ 75.00/day <br />Manometer.............................................................................................................. 20.00/day <br />Slope Inclinometer.................................................................................................. 50.00/day <br />Other Equipment....................................................................................... Separate Schedule <br /> <br />Outside direct costs such as equipment rental, outside services, and printing, copying, travel, <br />and subsistence................................................................................................... Cost + 15% <br /> <br />Contract personnel may be charged at the hourly rates listed above. Travel time will be <br />charged at regular hourly rates. Appearances as a witness (including depositions and court <br />appearances) will be charged at a rate of $350/hour plus expenses, with a minimum daily <br />charge of 4 hours. Preparation will be charged at regular hourly rates. <br /> <br />Invoices are due upon receipt and are past due 30 days after the invoice date. A finance <br />charge of 1.5 percent per month, or the maximum allowed by law, will be charged on past <br />due invoices. <br /> <br />Diaz.Yourman & Associates makes no warranty, either express or implied, to its statements, <br />conclusions, findings, recommendations or specifications except that they are prepared and <br />presented in accordance with generally accepted standard of care. <br /> <br />01a Boyle Proposal Q4-233_doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.