My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JT75C - 200 E. 1ST AMERICAN WAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/04/2005
>
JT75C - 200 E. 1ST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:48 PM
Creation date
3/30/2005 12:13:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
4/4/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CUP No. 04-24, DA No. 04-03, TTM No. 04-05, <br />VA No. 04-11, ZOA No. 04-05 and SPR No. 04-06 <br />November 22, 2004 <br />Page 7 <br /> <br />order to address impacts associated with their development and to <br />enhance the Sandpointe neighborhood (see Exhibit D of Exhibit 7 <br />[Development Agreement]). This agreement proposes to construct numerous <br />improvements in and around the Sandpointe neighborhood in addition to the <br />mitigation measures and conditions of approval imposed by the City for <br />their respective developments. The improvements will result in a total <br />cost of approximately $8.7 million, of which Geneva Commons shall <br />contribute approximately $1 million. The Redevelopment Agency's <br />obligation (from future tax increment) shall not exceed $5 million, with <br />Nexus Development responsible for contributing the remaining $2.7 million. <br />The primary improvements referenced in the five party agreement include: <br /> <br />a. The demolition and construction of a new 8-foot high painted <br />block wall with landscaping on Main Street from Murphy Avenue <br />south to Sunflower Avenue, and on Sunflower Avenue from Main <br />Street to just east of Ross Street ($1.1 million). <br />b. The installation of a traffic signal at MacArthur Boulevard <br />and Birch Street ($200,OOO). <br />c. The replacement of windows for approximately 40 homes that <br />back onto Main Street ($140,OOO). <br />d. Construction of a new loading zone for Taft Elementary School <br />on an adjacent church property ($1 million) . <br />e. Contributing $200,000 to the City for the preparation and <br />implementation of a Neighborhood Traffic Management Plan. The <br />plan will review changes in traffic patterns within the <br />Sandpointe neighborhood after completion of the proj ect and <br />includes construction of appropriate measures to mitigate the <br />increased traffic. <br />f. The undergrounding of utility lines on Main Street, MacArthur <br />Boulevard and Sunflower Avenue (estimated cost of <br />approximately $3.2 million). <br /> <br />Tentative Tract Map <br /> <br />Since Geneva Commons is an exclusively for-sale project, the applicant <br />is requesting approval of a tentative tract map for condominium <br />purposes. Based on a review of the tentative map by the Planning <br />Division and Public Works Agency, the project has been designed to be in <br />compliance with the applicable development standards found in Chapters <br />34 (Subdivision) and 41 (Zoning) of the Santa Ana Municipal Code and the <br />SD-43 zoning document. <br /> <br />75C-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.