My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
JT75C - 200 E. 1ST AMERICAN WAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/04/2005
>
JT75C - 200 E. 1ST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:48 PM
Creation date
3/30/2005 12:13:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75C
Date
4/4/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CUP No. 04-24, DA No. 04-03, TTM No. 04-05, <br />VA No. 04-11, ZOA No. 04-05 and SPR No. 04-06 <br />November 22, 2004 <br />Page 11 <br /> <br />contribution for the restriping of the southbound approach along Grand <br />Avenue at Dyer Road to provide one exclusive left turn lane, one shared <br />left turn lane and one exclusive right turn lane will be made. Also, a <br />fair share contribution for the restriping of the southbound approach of <br />Imperial Promenade to provide two exclusive left turn lanes, a shared <br />left turn-through lane and dual right lanes will be made. <br /> <br />Based on earlier Planning Commission discussions, the feasibility of a <br />pedestrian bridge linking the MacArthur Place and Hutton Center <br />developments was analyzed. The City's consulting urban designer studied <br />the intersection and considered impacts to the Geneva Commons and Nexus <br />projects and right-of-way in producing six alternatives and cost <br />estimates for a bridge across MacArthur Boulevard (Exhibit 12). The <br />study concluded that, although a bridge is feasible, existing and future <br />pedestrian counts might not justify a bridge at this intersection. <br /> <br />Conclusion <br /> <br />The Geneva Commons project is in compliance with the policies outlined <br />in the General Plan Land Use Element and will help preserve the identity <br />and integrity of MacArthur Place as a maj or development proj ect by <br />assisting in the development of this site. The development of this site <br />with high quality design, materials and finishes, the inclusion of <br />public art, and the creation of pedestrian linkages to the other <br />MacArthur Place developments will help in energizing and strengthening <br />the southern gateway to the City. Geneva Commons will reinforce an <br />active, vibrant urban lifestyle envisioned when the MacArthur Place <br />District Center plan was adopted in 1987. Additionally, the project <br />will be of direct benefit to the community by providing additional <br />housing opportunities in the City and by contributing toward <br />improvements to the Sandpointe area. Therefore, based upon an analysis <br />of the project and the project's compatibility with the City's General <br />Plan and applicable development standards, staff recommends that the <br />Planning Commission recommend City Council approval of Conditional Use <br />Permit No. 2004-24 as conditioned, Development Agreement No. 2004-03, <br />Tentative Tract Map No. 2004-05 as conditioned, Variance No. 2004-11 as <br />conditioned, Zoning Ordinance Amendment No. 2004-05 and Site Plan Review <br />No. 2004-06 as conditioned (Exhibits 13 through 19) . <br /> <br />75C-18 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.