Laserfiche WebLink
<br />T.E.L.A. shall provide guidance for acceptability and placement of on-site <br />clay fill materials. <br /> <br />36. Observation and field tests shall be performed during grading by a <br />representative of T.E.L.A. in order to assist the contractor in obtaining the <br />proper moisture content and required degree of compaction. Where less <br />than the required degree if compaction indicated, additional compactive <br />effort any necessary adjustments in the moisture content of the soil should <br />be made to obtain the required compaction. <br /> <br />37. To evaluate the presence of satisfactory materials at design elevations, <br />footing excavations should be observed to be clean of loosened soil and <br />debris before placing steel or concrete and probed for soft areas. If soft or <br />loose soils or unsatisfactory materials are encountered, these materials <br />should be removed and replaced with compacted fill. <br /> <br />38. Wherever, in the opinion of a representative of T.E.L.A, as unsatisfactory <br />condition is being created in any area, whether by cutting or filling, then <br />the work should not proceed in that area until the condition has been <br />corrected. <br /> <br />39. Prior to approval of final design plans, the project applicant shall submit <br />the proposed project to the Orange County Airport Land Use Commission <br />for review and consistency of FAA criteria and regulations. <br /> <br />40. Prior to approval of final design plans, the project applicant shall file a <br />Notice of Proposed Construction with the FAA. Conditions placed on the <br />project by the FAA shall be incorporated in the final design and <br />construction of the proposed project. <br /> <br />41. Prior to the issuance of grading permits, the project applicant shall provide <br />proof of coverage under NPDES General Construction Activity Storm <br />Water Permit, which includes a copy of the project permit number and two <br />copies of the Storm Water Pollution Prevention Plan. <br /> <br />42. Prior to the issuance of grading permits, the project applicant shall provide <br />a NPDES post construction storm water management plan per Orange <br />County Drainage Area Management Plan (DAMP) that includes all <br />Structural and Non-Structural Best Management Practices for the <br />proposed project. <br /> <br />43. Submit and have approved a surface drainage/utility plan to include all <br />structural Best Management Practices. <br /> <br />Exhibit "C" <br /> <br />fgt:~3931 <br />