My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/04/2005
>
FULL PACKET_2005-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:30 PM
Creation date
3/30/2005 12:16:36 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III. MAXIMUM PERMITTED BUILDING DENSITY/INTENSITY <br /> <br />A. MAXIMUM DENSITIES <br /> <br />The maximum authorized building densities/intensities for the MacArthur Place District Center are <br />as follows: <br /> <br />1. 4,051,000 square feet of Floor Area of office/commercial use; plus <br /> <br />2. 4(}Q-624 residential units with an authorized maximum of 500,000 square feet of Floor <br />Area of building structures to accommodate the residential units; <br /> <br />3. The maximum office/commercial density with no residential use is 4,175,000 square feet <br />of Floor Area. <br /> <br />The maximum densities can be converted or exchanged as follows: <br /> <br />a. 1,000 square feet of Floor Area for office space can be converted into and exchanged <br />for 2 hotel rooms (common areas in hotels are not calculated in the determination of <br />maximum densities). <br /> <br />b. 1,000 square feet of Floor Area of office space can be converted into and exchanged <br />for 3.23 residential units. <br /> <br />c. 1,000 square feet of Floor Area of office can be exchanged for 280 square feet of <br />retail commercial. <br /> <br />Parking structures are not included in the calculation of Floor Area. <br /> <br />The MacArthur Place District Center will be developed contingent on the installation of major <br />infrastructure improvements as set forth in the EIR. The applicable infrastructure improvements <br />corresponding to each phase of development within the MacArthur Place District Center are required <br />to be substantially completed as follows: <br /> <br />(i) With respect to the first phase of the Development, fifty percent (50%) of all applicable <br />first phase off-site improvements set forth in Section 2.4 and Table 1 of the EIR shall be <br />completed prior to the issuance of any tenancy occupancy permits with respect to the last <br />building to be constructed in such phase, and the remainder of all first phase off-site <br />improvements shall be completed not later than one year following the date of issuance of <br />such tenant occupancy permit. Notwithstanding the foregoing, as a condition to such <br />one-year extension of the obligation to complete such first phase off-site improvements, <br />Developer shall deliver to City sufficient security to ensure the completion of the <br />remaining first phase off-site improvements within such one-year period; <br /> <br />5 <br /> <br />CUP 04-24/DA 04-3/TTM 04-5 <br />SPR 04-6NA 04-11/Z0A 04-5 <br />EXI-IIBIT 10 <br />Page 1 of 2 <br />75C-88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.