Laserfiche WebLink
<br />GENEVA COMMONS MITIGATION MONITORING PROGRAM ER-2002-215 <br /> <br />MITIGATION MEASURE TIMING AGENCY VERIFICATION <br />Grading plans for the Prior to Building/Planning <br />proposed project shall reflect Grading Agency <br />that during demolishing, Permits & <br />earthwork and hauling During <br />activities, the contractor shall Construction <br />control fugitive dust <br />emissions by regular <br />watering, or other dust- <br />preventive measures to the <br />extent feasible to comply <br />with SCAQMD Rule 403: <br />All material excavated or <br />graded will be sufficiently <br />watered to prevent excessive <br />amounts of dust. Watering <br />with complete coverage shall <br />occur at least twice daily, <br />once in the late morning and <br />once after work is done for <br />the day. <br />All clearing and earthwork <br />activities shall cease during <br />period of high winds (winds <br />greater than 25 mph averaged <br />over one hour) or during <br />Stage 1 or Stage 2 smog <br />episodes. <br />Streets surrounding the <br />project site should be cleaned <br />at the end of each day of <br />construction. <br />All material transported <br />offsite shall either be <br />sufficiently watered or <br />securely covered to prevent <br />excessive amounts of dust. <br />The amount of area disturbed <br />by clearing and earthwork <br /> <br />1 <br /> <br />CUP 04-24/DA 04-3/TTM 04-5 <br />SPR 04-6NA 04-11/Z0A 04-5 <br />7 5eiJ If 13 9l <br />