Laserfiche WebLink
<br />streets. The plan is to include <br />existing and proposed <br />elevations at and adjacent to <br />all property lines. Drainage <br />routed to the street must be <br />directed beneath the sidewalk <br />and through the curb. <br />All design recommendations Prior to Building/Planning <br />identified in the geotechnical Grading Agency <br />investigation prepared by Permits & <br />T.E.L.A, April 2003 shall be During <br />incorporated into design Construction <br />plans and implemented <br />during construction. <br />Prior to grading, existing Prior to Building/Planning <br />vegetation, trash, surface Grading Agency <br />structures and debris shall be <br />removed and disposed off- <br />site at a legal dumpsite. Any <br />existing utility lines, or other <br />subsurface structures, which <br />are not to be utilized should <br />be removed, destroyed, or <br />abandoned in compliance <br />with current governmental <br />regulations and concurrence <br />from T.E.L.A. <br />Subsequent to clean up Prior to Building/Planning <br />operations, and prior to initial Grading Agency <br />grading, a reasonable search <br />should be made for <br />subsurface obstructions <br />and/or possible loose fill or <br />detrimental soil types. This <br />search should be conducted <br />by the contractor, with advice <br />from and under the <br />observation of a <br />representative of T .E.L.A. <br />Prior to the placement of fill During Building/Planning <br />or foundations within the Construction Agency <br />building area, the site should <br /> <br />3 <br /> <br />75C-141 <br />