My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WILLDAN - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
WILLDAN - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 1:15:12 PM
Creation date
3/30/2005 4:35:54 PM
Metadata
Fields
Template:
Contracts
Company Name
Willdan
Contract #
A-2005-024
Agency
Public Works
Council Approval Date
2/7/2005
Expiration Date
6/30/2006
Insurance Exp Date
11/9/2008
Destruction Year
2012
Notes
Amended by A-2005-024-01, -02, A-2006-223
Document Relationships
WILLDAN - 2006
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />On -Cali Engineering and Landscaping Design Services <br />Mr. Kenneth Taylor, P.E., will be responsible for the Drainage Design related to this project. Mr. Taylor is <br />responsible for the design of storm drains, sewer systems, roadway and freeway improvement projects for <br />public agencies. He has been responsible for the preparation of geometric approval plans, project reports, <br />project study reports and final PS&E for Caltrans. His duties include close coordination with various <br />government agencies, subconsultants, and utility agencies. Most recently, Mr. Taylor managed the <br />improvements to the Los Angeles River for the Corps. Several bridges were modified, including the <br />construction of a new railroad bridge over the channel as part of these improvements. The regional <br />bike/pedestrian trail along the levees was also modified as part of the channel improvements. Mr. Taylor has <br />an excellent working relationship with the Corps of Engineers. <br />ORGANIZATION CHART <br />CITY OF SANTA ANA <br />SOURI AMIRANI, P.E. <br />Principal -in -Charge and QA/QC <br />Dmid L. Hunt. P.E. <br />Project Manager <br />Kenneth Slee/e, P.E. <br />Engineering Drainage Civil Design <br />Ken Taylor, P.E Kenneth Steele, P.E. <br />Om id Knell P.L.S Jaynes Truants, P.E. Stere Leathers, P.E. <br />Tom Kirk <br />Utility' Coordination <br />Em ironmenral Ed Cox <br />Dean Sheree A1C P. <br />John Bellas <br />Structures <br />Peter Liu. P.E. SE <br />Eric Johnson. P.E. <br />WILLDAN <br />Landscape Architecture <br />John Hidalgo. R.L.A. <br />Jason Koldt <br />Brain,vguyen. R.L.A. <br />Traffic Design <br />Scott Bacsikin. P.E. <br />Karen Urman <br />Peter Kerescles <br />Traffic Study <br />Heather Keres_les <br />Geotechnical/Hazmat <br />Ross Khiabani. P.E.. G.E <br />Liping Yon, Ph.D.. P.E., G.E. <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.