My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:51:18 PM
Creation date
3/30/2005 4:38:01 PM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates, Inc.
Contract #
A-2005-012
Agency
Public Works
Council Approval Date
1/18/2005
Expiration Date
12/31/2005
Insurance Exp Date
9/30/2009
Destruction Year
2016
Notes
Amended by A-2005-012-01, -02
Document Relationships
W. Koo & Associates 3a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
W. KOO & ASSOCIATES 3B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Division of <br />• <br />A employee -owned company <br />December 27, 2004 <br />Ms. Souri Amirani, P.E. <br />City of Santa Ana — Public Works Agency <br />Office of the Executive Director <br />20 Civic Center Plaza, 4m Floor <br />Santa Ana, CA 92701 <br />Re: Bridge Rehabilitation and Bike Trail Structure Design Consultant Services Fee Proposal <br />Dear Ms. Amirani, <br />W. Koo & Associates, Inc. (WKA), a division of PBS&J, is pleased to submit this fee proposal to <br />the City of Santa Ana for Bridge Rehabilitation and Bike Trail Structure Design Consultant <br />Services. Pursuant to our meeting on December 14`s the fee proposal has been revised to reflect <br />the updated scope. Presented below is a summary of the work items that have been deleted from <br />the previous fee proposal: <br />• Geotechnical report for Flower Street over Santiago Creek <br />• Geotechnical Field Investigation & Laboratory Testing (May need to be added back if the <br />existing LOTB is inadequate) <br />• Utility Coordination (To be completed by City) <br />• Topographic surveys and surveys for centerline tie at all four locations. <br />• Roadway survey on McFadden <br />• Alternatives Analysis of the Bike Trail structure type (The preferred design is the <br />cantilever structure) <br />• Hydraulic Analysis of the Santa Ana -Della Channel <br />• CEQA & NEPA documents for Flower Street Bridge Rehabilitation <br />The full text of the revised scope and fee are attached. We are confident that the enclosed fee <br />proposal reflects our clear understanding of the project issues and a solid approach to performing <br />the necessary services. If you have any questions, please don't hesitate to call me at (714) 456- <br />0280. <br />Respectfully Submitted, <br />W. KOO & ASSOCIATES, INC. <br />Dan Weddell, P.E. <br />Project Manager <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.