Laserfiche WebLink
Santa Ana Bridge Rehabilitation and Bike Trail Structure 12/27/2004 <br />Bikepath structure along the Delhi Channel. Consultant assumes that this documentation <br />will consist of a short -form Historic Property Survey Report (HPSR) and short -form <br />Archaeological Survey Report (ASR), including an Area of Potential Effects (APE) Map. <br />The HPSR/ASR report package will contain the SCCIC records search, evidence of <br />Native American and local historical consultations, and appropriate exhibits. <br />TASK 2.4: WATER QUALITY STUDY <br />The WKA Team will prepare a Water Quality Study for Fifth Street, McFadden Ave <br />rehabilitation projects as well as the Flower Street Bike Structure project. The study will: <br />(1) identify the sources of sediment and other pollutants affect the quality of storm water <br />discharges and (2) to describe practices to reduce sediment and other pollutants in <br />stormwater discharges generated from the construction site. Standard control measures <br />will be recommended. The Water Quality Study will provide a preliminary broad overview <br />of available methods to reduce sediment, pollutants, and other construction related <br />debris from impacting stormwater quality. <br />TASK2.5: NEPA COMPLIANCE <br />On behalf of the project applicant (City), the Consultant will forward environmental and <br />preliminary engineering documentation which demonstrates that significant <br />environmental effects will not result with project implementation. This submittal will be <br />accompanied by a draft PCE with formal request for approval. A separate submittal will <br />be required for each project. <br />RBF will respond to one (1) comprehensive set of comments on the Draft documents. <br />The revised Draft Reports will incorporate all comments received on the Draft <br />documents. RBF will provide three (3) copies of each Final Technical Report (separately <br />bound) to the City of Santa Ana. <br />TASK2.6: CEQA COMPLIANCE <br />RBF will prepared three separate Categorical Exemptions (CEs) pursuant to CEQA for <br />processing by the City. <br />TASK 3.O - REGULATORY PROCESSING <br />The following will be prepared for the three HBRR rehabilitation structures. <br />TASK 3.1: SITE VISIT To DETERMINE CORPS JURISDICTION <br />RBF will determine acreage considered by the Army Corps of Engineers (ACOE) and <br />the California Department of Fish and Game (CDFG) to be jurisdictional non -wetland <br />waters of the United States.@ Since these areas of the Santa Ana River are concrete <br />lined, it is assumed that no Wetlands will be identified. RBF will conduct a site <br />investigation with respect to hydrology, hydrophytic vegetation (if applicable), and hydric <br />soils (if applicable). RBF will prepare a determination of the ordinary high water mark <br />(OHWM) within the existing drainage channel. <br />