My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-040 - Approving Conditional Use Permit No. 2004-24
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-040 - Approving Conditional Use Permit No. 2004-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 12:10:45 PM
Creation date
4/15/2005 4:55:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-040
Date
4/4/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />63. <br /> <br />64. <br /> <br />65, <br /> <br />66. <br /> <br />67. <br /> <br />68. <br /> <br />69. <br /> <br />70, <br /> <br />Prior to the issuance of building permits, the project developer shall submit <br />evidence to the City of Santa Ana ofa fee payment between the developer <br />and the SAUSD to offset school facility related impacts. <br /> <br />Prior to theil!sUanceof certificate of occupancy permits the project <br />developershall meet Municipal Code Parkland requirements through the <br />dedicationoflarIdànd/orthêþayment dfparkimpaêt fees, as determined <br />by the Planning Division. <br /> <br />Prior to the issuance of building permits thêproject applicant shall provide <br />a fair share contribution for the restriping of the southbolJnd approach <br />along Grand Avenue to provide one exclusive left turn lane, one shared <br />left turn lane and one exclusive right turn lane. <br /> <br />Prior to the issuance of building permits, the project applicant shall provide <br />a fair share contribution for the restriping of the southbound approach of <br />Imperial Promenade to provide two exclusive left turn lanes, a shared left <br />turn-through lane and dual right lanes. <br /> <br />The project applicant shall be subject to Transportation System <br />Improvement Fees and San Joaquin Hills corridor Fees. <br /> <br />Prior to final approval of the proposed project by the City of Santa Ana, the <br />projectapplìcantshall receive all rIecessary approvals from the FAA and <br />the Orange County Airport Land Use Commission, unless overruled by the <br />City Council. <br /> <br />Prior to the issuance of grading permits, the project applicant shall <br />coordinate with the City of Santa Ana Water Department regarding the <br />depths, locations and sizes of proposed water distribution facilities. <br /> <br />Water conservation measures recommended by the State Department of <br />Water Resources and applicable state laws requiring the use of water- <br />efficient plumbing fixtures and recommendations for low-water-using <br />landscape shall be incorporated into the project design as appropriate. <br />GPM are prohibited. <br /> <br />B. <br /> <br />Police Department <br /> <br />1. <br /> <br />A security plan must be submitted to the Police Department at the plan <br />check stage for approval. The plan must cover all aspects of the projects <br />security including security personnel, surveillance equipment, and <br />hardware. The project will be required to have a minimum of four state <br />licensed uniformed security personnel. One security officer will be <br />required for each building, one for the podium level and one for the <br />parking garage. <br /> <br />ResQMion 2005-040 <br />Page 56 of 61 <br /> <br />Exhibit 'C' <br />Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.