My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 1516, 1518, 1520, 1522, 1526, 1528 EAST WARNER AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
05/16/2005
>
31A - 1516, 1518, 1520, 1522, 1526, 1528 EAST WARNER AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:30 PM
Creation date
5/10/2005 4:25:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
5/16/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(C) No Impact <br /> <br />According to the General Plan Land Use Element EIR, the project <br />site does not contain any unique geologic features. Therefore, <br />implementation of the proposed project would not result in <br />adverse impacts to any unique geologic feature. <br /> <br />(D.E) No Impact <br /> <br />According to the General Plan Land Use Element EIR, the project <br />site is known to contain soils (Chino Series) that have moderate <br />shrink/swell potential, high potential for corrosion of uncoated <br />steel and low potential for corrosion of concrete. Since the <br />project consists only of the subdivision of land and air space <br />and doesn't involve any new buildings or new building square <br />footage, implementation of the proposed project should not <br />resul t in on- or off - si te landslides, lateral spreading, <br />subsidence, liquefaction or collapse. Any new development, if <br />proposed, would be required to submit a construction-level <br />geotechnical report to ensure the geotechnical stability of the <br />project site. <br /> <br />VII HAZARDS/HAZARDOUS MATERIALS <br /> <br />(A.B) Less than Significant Impact <br /> <br />Implementation of the proposed proj ect would not involve the <br />handling, storage or transportation of significant amounts of <br />hazardous materials. Normal construction operations associated <br />with the proposed project would involve the handling of <br />incidental amounts of hazardous materials. The proposed project <br />would be required to comply with local, state and federal <br />requirements regarding the handling and storage of hazardous <br />materials. Compliance with local, state and federal regulations <br />regarding the handling and storage of hazardous materials would <br />reduce potential hazardous material impacts to a level that is <br />considered less than significant. <br /> <br />8 <br /> <br />31A~118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.