My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 100 W. MACARTHUR BLVD.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/06/2005
>
31A - 100 W. MACARTHUR BLVD.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:13 PM
Creation date
5/31/2005 5:11:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
6/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APRIL 25, 2005 <br />PAGE20F5 <br /> <br />Mitigation Measures <br /> <br />8. During construction, the contractor is required to comply with <br />SCAQMD Fugitive Dust Rule 403 to suppress dust generated by <br />construction operations. <br /> <br />9. All materials excavated or graded will be sufficiently watered <br />to prevent excessive amount of dust. <br /> <br />10. All clearing and earthwork activities shall cease during <br />period of high winds (winds greater than 25 mph averaged over <br />one hour) or during Stage 1 or Stage 2 smog episodes. <br /> <br />11. Streets surrounding the project site should be cleaned at the <br />end of each day of construction. <br /> <br />12. All materials transported off-site shall either be <br />sufficiently watered or securely covered to prevent excessive <br />amounts of dust. <br /> <br />13. Equipment engines shall be maintained in good condition and in <br />proper tune according to manufacturer's specifications. <br /> <br />14. To the extent feasible, gasoline powered equipment shall be <br />used for on-site and off-site construction activities. <br /> <br />15. The approved site plan for the project shall show the location <br />of all monitoring wells on the project site. The site plan <br />shall reflect that the monitoring wells would be accessible <br />for monitoring and maintenance during the construction and <br />operation of the project. <br /> <br />16. <br /> <br />Prior to issuance <br />shall coordinate <br />Commission. <br /> <br />of building permit, the proj ect <br />with the John Wayne Airport <br /> <br />applicant <br />Land Use <br /> <br />17. <br /> <br />Building plans for the <br />sand/grease interceptor is <br />wash area. <br /> <br />project <br />provided <br /> <br />shall <br />within <br /> <br />reflect that a <br />the proposed car <br /> <br />31A-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.