Laserfiche WebLink
<br />pollutants in the South Coast Air Basin. Pollutants for <br />which ambient standards have set are referred to as <br />criteria pollutants. Criteria pollutants include Ozone <br />(03), Carbon Monoxide (CO), Nitrogen Dioxide (N02), Sulfur <br />Dioxide (S02), and Particulate Matter (PMI0). The South <br />Coast Air Basin is currently a non-attainment area for <br />Carbon Monoxide, Ozone and Particulate Matter. The SCAQMD <br />considers an air quality impact to be significant if it <br />exceeds the criteria pollutant thresholds identified in the <br />Table A-I. <br /> <br />Table A-I <br />EMISSION THRESHOLDS OF SIGNIFICANCE <br /> <br /> Project <br />Pollutant Construction Tons/ Operations <br /> Pounds/Day Quarter Pounds/Day <br />Carbon Monoxide 550 24.75 550 <br />Reactive Organic <br />Compounds 75 2.5 55 <br />Nitrogen Oxides 100 2.5 55 <br />Particulate <br />Matter 150 6.75 150 <br /> <br />Long-ter.m Operational Air Quality Impacts <br /> <br />The primary source of long-term operational emissions <br />associated with the proposed project would be generated by <br />vehicle travel to and from the project site. A relatively <br />minor amount of gaseous emissions would also occur from <br />natural gas and electricity usage. The proposed project is <br />consistent with the General Plan. The long-term operational <br />emissions generated by the proposed project would be <br />consistent with the air pollutant emissions projected <br />within the General Plan Land Use Element ErR. Additionally, <br />the proposed project would be developed at a level of <br />intensity that would be less than maximum allowable <br />intensity under the General Plan. Therefore, long-term air <br />quali ty emissions generated by the proposed proj ect would <br />be less that what was proj ected for in the General Plan <br />Land Use Element EIR. <br /> <br />Short-ter.m constructed Related Air Quality Impacts <br /> <br />The majority of the construction operations for the <br />proposed project would be interior tenant improvements. <br /> <br />6 <br /> <br />31As-J 7 <br />