Laserfiche WebLink
<br />.: <br /> <br />.;. , <br /> <br />t'T <br />, i <br /> <br />Ii <br /> <br />! <br />II <br />i <br />i <br /> <br />i) <br /> <br />DMIT (Aueust 7, 1990) <br /> <br />783- <br /> <br />39. <br /> <br />Prior to building permit issuance, the project applicant shall consult with Southern <br />California Edision (SeE) and Southern California Gas (SeG) representatives to ensure <br />the proposed project design is compatible with existin& electrical and natural gas <br />, services, respectively, and 10 reduce impacts of possible short.term outages to existing <br />customers during construction. <br /> <br />Timinr of IrnpJementBtionNerific8tion: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and written <br />verification from Southern California <br />Edision and Southern California Gas <br /> <br />Responsible Panies: <br /> <br />Sr. Plan Qedc Engineer, BuDding DiviSion <br /> <br />Verification (Name &. DatCV= <br /> <br />40. Prior to issuance of building permits, the City of Santa Ana shall determine through <br />plan revic:v.'S that installation by the project applicant of needed onsite electrical and <br />natural gas systems to serve the project shall be coordinated with installation of other <br />utilities. <br /> <br />Timil1i of ImpJementationNerification; <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification; <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Re$ponsible Panics: <br /> <br />Sr. Plan DIeck Engineert Building Division <br />&. Manager, Engineer Services <br /> <br />Verification O'lame &. Date): <br /> <br />41. Prior to issuance of building permits. tbe City of Santa Ana shaH determine through <br />plan reviews that aU buiJdinas constructed by.the project applicant within tbe project <br />site shall adhere to the State Title 24 energy standards. which set r 0 rt hen e r gy <br />conservation requirements. <br /> <br />TIml"&' of lrnplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Building and architectural plan checb and <br />field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Cleek Engineer, BuDding Division <br /> <br />Verification (J'Jame &. Datc): <br /> <br />88SMMP <br /> <br />14 <br /> <br />7e&-60 <br />