Laserfiche WebLink
<br />\. <br /> <br />DRAFT (Au&usC " 1990) <br /> <br />.' 785' <br /> <br />45. <br /> <br />Prior to building permit issuance, the City of Santa Ana Public Works Department <br />shall determine chac waler conservation measures are incorporated into the site design <br />in accordance with app]~ble state and city statutes and policies, including the use of <br />low-nush toiJeLs, low-now faucets, self..closing valves on drinking fountains. water <br />. pressure-reducing valvcst low-waler-using plants in landscaping, and efficient landscape <br />irrigation systems that minimize run~rr and evaporation and maximize water reaching <br />plant roots. <br /> <br />.--- <br /> <br />, i <br />" <br />i I <br />i i <br />j I <br />i! <br /> <br />Timin, of ImplementlltionNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Landscape plan check and building <br />(plumbing) plan check and field inspection <br /> <br />. <br /> <br />RC$ponsible PaTties: <br /> <br />Sr. Plan Cleek Engineer, Building Division <br />8:. Manager, Engineer Services <br /> <br />Verification (Name &:. Date): <br /> <br />46. Prior to building permit issuance, onsite wastewater collection facilities needed to serve <br />the project shall be reviewed and approved by the City of Santa Ana Public Works <br />Department and shaJJ be instalJed by the project applicant. <br /> <br />Timinr of ImplementationNerificBtion: <br /> <br />Prior to bUJlding permit issuan::c <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, BuDding Division <br />8:. Manager, Engineer Services <br /> <br />Verification (Name &. Date): <br /> <br />47. Prior to building permit issuance, site plans shall be reviewed by the City of Santa <br />Ana Public Works Depanment to verify that adequate space is provided onsite for <br />recycling receptacles.. <br /> <br />".-- <br /> <br />Ii <br />I <br />j <br />I <br />! <br /> <br />Timill' of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />.M~thod of Verification: <br /> <br />Building plans check and field inspection <br /> <br />RespondbJe Panics: <br /> <br />Sr. Plan O1eck Engineer, Building Division <br />&. Manager, Engineer Services <br /> <br />Verification (Name & DaJe): <br /> <br />885MMP <br /> <br />16 <br /> <br />7.5S962 <br />