Laserfiche WebLink
<br />RESOLUTION 2005-052 <br />REVENUE FY 05-06 <br />ACCOUNT DEPARTMENTIMISCELLANEOUS FEE OR SERVICE UNIT FEES <br />SECTION IV FIRE DEPARTMENT <br />5520 False Alanns (Santa Ana Municipal Code 14-38) <br /> System Malfunctions Each 108.00 <br /> Deliberate Act Each 186.00 <br /> NOTE: One aI/owed in 30 days; Two in 90 days; <br /> Three aI/owed in any J 2 month period <br />5935 Fire Code Pennit Fee <br /> Section I: Fire Code Pennits for Specific Hazards. <br /> Renewable Annually or per Event: <br /> Aerosol Products Fee 110.00 <br /> Aircraft Refueling Vehicles Fee 110.00 <br /> Aircraft Repair Hanger Fee 110.00 <br /> Asbestos Removal Fee 110.00 <br /> Assembly <br /> See "Places of Assembly" <br /> Automotive Wrecking Yard Fee 110.00 <br /> Battery System Fee 110.00 <br /> Cellulose Nitrate Film Fee 110.00 <br /> Cellulose Nitrate Storage Fee 110.00 <br /> Combustible Fiber Storage Fee 110.00 <br /> Combustible Material Storage Fee 110.00 <br /> Compressed Gases-Medical Oxygen Fee 110.00 <br /> Commercial Rubbish-Handling Operation Fee 110.00 <br /> Dry Cleaning Plants Fee 110.00 <br /> Dust-Producing Operations Fee 110.00 <br /> Explosives or Blasting Agents Fee 110.00 <br /> Flammab]e or Combustible Liquids; <br /> 1 Class I liquids, inside storage, Fee 110.00 <br /> more than 5 gallons, but less than 55 gallons. <br /> 2 Class I liquids, outside storage, more than 10 gallons, Fee 110.00 <br /> but less than 55 gallons. <br /> 3 Class II and Class III-A liquids, inside storage, Fee 110.00 <br /> more than 25 gallons, but less than 55 gallons. <br /> Fruit Ripening Fee ] 10.00 <br /> Fumigation or Thennal Insecticidal Fogging Fee 110.00 <br /> High-Piled Combustible Storage Fee ] 10.00 <br /> Hot-Work Operations Fee ] 10.00 <br /> Lumber Yards Fee ] 10.00 <br /> Magnesium Working Fee ] 10.00 <br /> Organic Coating Fee ] 1000 <br /> Ovens, Industrial Baking or Drying Fee 110.00 <br /> Places of Assemb]y <br /> A-3, occupant load 50-200 Fee 120.00 <br /> A-2.1, occupant load 300 or more. wlo a stage Fee 240.00 <br /> A-2, occupant load 999 or less, with a stage Fee 240.00 <br /> A-I, occupant load 1000 or more, with a stage Fee 240.00 <br /> Refrigeration Equipment Fee 1]0.00 <br /> Repair Garages Fee 1]0.00 <br /> Spraying or Dipping Fee ] 10.00 <br /> Tents, Canopies and Temporary Membrane Structures <br /> See Section II "Special Pennits" <br /> Tire Storage Fee ] 10.00 <br /> Wood Products Fee ] 10.00 <br /> <br />8 <br /> <br />75A2-15 <br />