My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - NEXUS DEVELOPMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/20/2005
>
75B - NEXUS DEVELOPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:54:43 PM
Creation date
6/15/2005 2:26:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/20/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MacArthur Place South Findings and Facts in Support of Findings <br />Environmental Impact Report <br /> <br />Quality Management Plan (WQMP) based on the Final Grading Plan, to be approved by <br />the City's Director of Public Works. The WQMP shall be consistent with the DAMP and <br />shall contain provisions and BMP s for construction and operation conditions. <br /> <br />HW-7 Prior to the issuance of building permits, the project developer shall pay the City's <br />drainage impact fee. <br /> <br />HW-8 Prior to the issuance of grading permits, the project developer shall verify that structural <br />BMP s have been permanently incorporated into project plans. Such BMP s shall ensure <br />that pollutants from project-related storm water runoff are mitigated consistently with <br />applicable state and local standards. <br /> <br />HW-9 Prior to issuance of grading permits, the project developer shall submit a final drainage <br />plan to the City identifying the exact size and location of drainage facilities. <br /> <br />HW-I0Prior to issuance of grading permits, the project developer shall provide proof of an <br />NPDES permit from RWQCB to the City for onsite dewatering activities. <br /> <br />HW-llPrior to issuance of building permits for tenant improvements for restaurant uses, the <br />project developer shall ensure that the proposed restaurants are fitted with grease <br />interceptors to the size and capacity as designated by the City of Santa Ana Building <br />Division. <br /> <br />Level of Significance of Impacts Related to Hydrology and Water Quality <br /> <br />The adverse impacts of the MacArthur Place South project related to Hydrology and Water <br />Quality would be mitigated to below a level of significance based on the implementation of <br />mitigation measures HW-l, HW-2, HW-3, HW-4, HW-5, HW-6, HW-7, HW-8, HW-9, HW-I0, <br />and HW-ll. <br /> <br />4.2.5 Impacts Related to Noise <br /> <br />Potentially Significant Adverse Impacts Related to Noise <br /> <br />As discussed in Section 5.8, the construction of the project would result in short-term noise <br />impacts. Additionally, during the operation of the project proposed residential uses would be <br />impacted with noise levels in excess of the City's General Plan noise standards. <br /> <br />Findings Related to Noise Impacts <br /> <br />Mitigation measures and/or project enhancement measures have been incorporated into the <br />project, which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br /> <br />Facts in Support of the Finding Related to Noise Impacts <br /> <br />Exhibit B <br />Page 21 of 38 <br /> <br />Page 21 <br /> <br />75B-49 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.