My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - NEXUS DEVELOPMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/20/2005
>
75B - NEXUS DEVELOPMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:54:43 PM
Creation date
6/15/2005 2:26:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/20/2005
Destruction Year
2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MacArthur Place South Findings and Facts in Support of Findings <br />Environmental Impact Report <br /> <br />units per acre for MacArthur Place South. <br /> <br />(j) Implementation of the Without Cinema Tower Environmentally Superior would result I a <br />project that would not have the scale of the urban form envision MacArthur Place District <br />Center. <br /> <br />(k) The Without Cinema Tower Environmentally Superior Alternative would result in 154 <br />fewer residential units and would make the project less economically viable. <br /> <br />For the reasons stated above, and based on substantial evidence in the record before it, the City <br />finds that the unavoidable adverse impacts of the MacArthur Place South project related to <br />aesthetics, short-term, long-term and cumulative air quality and surface transportation are <br />acceptable and, furthermore, finds that the benefits of the project outweigh its unavoidable <br />adverse environmental impacts. <br /> <br />8.0 RECORD OF PROCEEDINGS <br /> <br />Various documents and other materials constitute the record of proceedings on which the City of <br />Santa Ana bases its Findings and decisions contained herein. Most documents related to this <br />Final EIR are located at the City of Santa Ana, Planning and Building Department, 20 Civic <br />Center Plaza, Santa Ana, California, 92702. Some documents included in the record of <br />proceedings may also be located at the offices of consultants retained by the City for this project. <br /> <br />9.0 SUMMARY <br /> <br />1. Based on the foregoing Findings and the information contained in the record, the City of <br />Santa Ana has made one or more of the following findings with respect to each significant <br />adverse impact of the proposed project, as identified in the Final EIR: <br /> <br />· Mitigation measures and/or project enhancement measures have been incorporated into <br />the project which avoid or substantially lessen the significant environmental effect as <br />identified in the EIR. <br /> <br />· Such changes or alterations are within the responsibility and jurisdiction of another public <br />agency and not the agency making the finding. Such changes have been adopted by such <br />other agency or can and should be adopted by such other agency. <br /> <br />· Specific economic, legal, social, technological or other considerations, make infeasible <br />mitigation measures or project alternatives identified in the Final EIR to reduce <br />unavoidable significant impacts to a level that would be less than significant. <br /> <br />2. Based on the Findings stated herein and information contained in the record, it is hereby <br />determined that: <br /> <br />a. All significant adverse impacts on the environment due to the approval of the project <br />have been eliminated or substantially lessened where feasible. <br /> <br />Exhibit B <br />Page 37 of38 <br /> <br />Page 37 <br /> <br />75B-65 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.