Laserfiche WebLink
<br />RESOLUTION 2005-052 <br />REVENUE FY 05-06 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES <br />SECTION X PLANNING & BUILDING AGENCY <br /> FEE SCHEDULE <br />5915 I) For the installation or relocation of each forced~air or <br /> gravity-type furnace or burner, including ducts and <br /> vents attached to such appliance, up to and including Each 23.50 <br /> 100,000 BTUth <br />5915 2) For the installation or relocation of each forced-air <br /> or gravity-type furnace or burner, including ducts <br /> and vents attached to such appliance over 100,000 BTUlh Eaoh 33.50 <br />5915 3) For the installation or relocation of each boiler, compressor. <br /> condensing unit or heat pump up to and including five <br /> horsepower, or each absorption system to and including <br /> 100,000 BTUth Eaoh 40.50 <br />5915 4) For the installation or relocation of each boiler, <br /> compressor. condensing unit or heat pump over five <br /> horsepower up to and including 30 horsepower or <br /> for each absorption system over 100,000 BTUlh up <br /> to and including 1,000,000 BTU/h Each 40.50 <br />59]5 5) For the installation, relocation of each boiler, compressor. <br /> condensing unit or heat pump over 29 horsepower up to and <br /> including 50 horsepower or for each absorption system over <br /> 1,000,000 BTU/h up to and including 1,750,000 BTU/h Each 49,25 <br />5915 6) For the installation or relocation of each boiler, compressor, <br /> condensing unit or heat pump over 49 horsepower, or each <br /> absorption system over ],750.000 BTU/h Each 67.50 <br />5915 7) For each V A V control box or air handling <br /> unit to and including 2,000 cubic feet per minute. <br /> including ducts attached thereto Each 16.00 <br />59]5 ') For each V A V or air-handling unit over 2,000 cfm Each 23.50 <br /> Note: This fee shall not apply to an air-handling <br /> unit which is a portion of a factoI)' assembled <br /> appliance, cooling unit, evaporative cooler or <br /> absorption unit for which a permit is required else <br /> where in this code. <br />59]5 9) Outdoor dual packaged heating and cooling Eaoh 40.50 <br />5915 10) For the installation or relocation of each floor <br /> furnace, including vent Eaoh 23.50 <br />5915 II) For the installation or relocation of each suspended <br /> heater, recessed wall heater or floor-mounted unit heater Eaoh 23.50 <br />5915 12) Decorative fireplace Eaoh 23.50 <br />5915 13) For the repair of, alteration of, or addition to each heating <br /> appliance, refrigeration unit, cooling unit, absorption <br /> unit, or each heating cooling, absorption, or evaporative <br /> cooling system, including installation of controls <br /> regulated by this code Each ]6.00 <br /> Note: Each HV AC system served by a V A V <br /> control box is considered a separate system. <br />59]5 14) For the installation of each Type I commercial <br /> kitchen hood which is served by mechanical exhaust, <br /> including the ducts for each hood Each 40.50 <br />5915 15) For the installation of each Type 11 residential or <br /> commercial kitchen hoods which is served by mechanical <br /> exhaust, including the ducts for each hood Each 23.50 <br />Resolution (IM!52005-052 16) For each ventilation fan connected to a single duct <br />Page 54 of 60 <br /> 49 <br />