My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SecSol
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SecSol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:27:40 PM
Creation date
6/23/2005 9:30:38 AM
Metadata
Fields
Template:
Contracts
Company Name
SecSol Inc, dba Security Solutions
Contract #
A-2005-113
Agency
Public Works
Council Approval Date
6/6/2005
Insurance Exp Date
3/20/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01025 — MEASUREMENT AND PAYMENT <br />PART 1 — GENERAL <br />1.1 SCOPE <br />A. Payment for the various items of the Bid Sheets, as further specified herein, shall <br />include all compensation to be received by the CONTRACTOR for furnishing all tools, <br />equipment, supplies, and manufactured articles, and for all labor, operations, and <br />incidentals appurtenant to the items of work being described, as necessary to <br />complete the various items of the WORK all in accordance with the requirements of <br />the Contract Documents, including all appurtenances thereto, and including all costs <br />of compliance with the regulations of public agencies having jurisdiction, including <br />Safety and Health Requirements of the Occupational Safety and Health <br />Administration of the U.S. Department of Labor (OSHA). Payment will be made for <br />items as set forth in the Bid Schedule; all costs therefore shall be included in the <br />prices named in the Bid Schedule for the various appurtenant items of work. <br />1.2 PAYMENT SCHEDULE <br />A. Payments, in percent of the total contract amount indicated (less retainage), will be <br />made upon satisfactory completion of specific work items as follows: <br />1. Approved Shop Drawing Submittals 20% <br />2. Delivery of (all) Equipment to Site 20% <br />3. Preliminary Installation and Testing 20% <br />4. Field Start-up including Functional/Performance Testing 15% <br />5. 30-Day Acceptance Test 15% <br />6. Delivery of all As -built Drawings, Final Documentation, <br />Spare Parts, Supplies, Tools and Test Equipment 10% <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />- END OF SECTION - <br />Lay or Santa Ana Measurement and Payment <br />Security Management System Project Page 01025-1 <br />SantaAna SMS 01025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.