My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SecSol
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SecSol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:27:40 PM
Creation date
6/23/2005 9:30:38 AM
Metadata
Fields
Template:
Contracts
Company Name
SecSol Inc, dba Security Solutions
Contract #
A-2005-113
Agency
Public Works
Council Approval Date
6/6/2005
Insurance Exp Date
3/20/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operation procedures <br />Load changes <br />Calibration <br />Shutdown <br />Troubleshooting <br />Disassembly <br />Reassembly <br />Realignment <br />Testing to determine performance efficiency <br />Tabulation of proper settings for all pressure relief valves, low and high- <br />pressure switches, and other protection devices <br />List of all electrical relay settings including alarm and contact settings <br />3. Part 3 — Preventive Maintenance Procedures: <br />a. Procedures: Preventive maintenance procedures shall include all <br />manufacturer -recommended procedures to be performed on a periodic <br />basis, both by removing and replacing the equipment or component, and <br />by leaving the equipment in place. <br />b. Schedules: Recommended frequency of preventive maintenance <br />procedures shall be included. Lubrication schedules, including lubricant <br />SAE grade, type, and temperature ranges, shall be covered. <br />4. Part 4 - Parts List: <br />a. Parts List: A complete parts list shall be furnished, including a generic <br />description and manufacturer's identification number for each part. <br />Addresses and telephone numbers of the nearest supplier and parts <br />warehouse shall be included. <br />b. Drawings: Cross -sectional or exploded view drawings shall accompany the <br />parts list. <br />5. Part 5 - Wiring Diagrams: <br />a. Diagrams: Part 5 shall include complete internal and connection wiring <br />diagrams for electrical equipment items. <br />6. Part 6 - Shop Drawings: <br />a. Drawings: This part shall include approved shop or fabrication drawings, <br />complete with dimensions. <br />7. Part 7 - Safety: <br />a. Procedures: This part describes the safety precautions to be taken when <br />operating and maintaining the equipment or working near it. <br />8. Part 8 - Documentation: <br />City of Santa Ana Contractor Submittals <br />Security Management System Project Page 01300-4 <br />SantaAna_SMS_01300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.