My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SecSol
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SecSol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:27:40 PM
Creation date
6/23/2005 9:30:38 AM
Metadata
Fields
Template:
Contracts
Company Name
SecSol Inc, dba Security Solutions
Contract #
A-2005-113
Agency
Public Works
Council Approval Date
6/6/2005
Insurance Exp Date
3/20/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01660 — EQUIPMENT TESTING AND SYSTEM STARTUP <br />PART 1 — GENERAL <br />1.1 GENERAL <br />A. Equipment testing and system startup are requisite to satisfactory completion of the <br />contract and, therefore, shall be completed within the contract time. <br />1.2 EQUIPMENT TESTING <br />A. The CONTRACTOR shall be responsible for scheduling all operations testing. The <br />CONTRACTOR is advised that the ENGINEER and the CITY's operating personnel <br />will witness operations testing and that the manufacturer's representative shall be <br />required to instruct the CITY's operating personnel in correct operation and <br />maintenance procedures. Such instruction shall be scheduled at a time arranged with <br />the CITY at least 2 weeks in advance and shall be provided while the respective <br />manufacturer's equipment is fully operational. Qualified persons who have been <br />made familiar in advance with the equipment and systems in the plant shall give on - <br />site instruction. Prior to scheduling any operations testing, the CONTRACTOR shall <br />have previously furnished the Owner's Manuals required under Section 01300. <br />B. The CONTRACTOR shall notify the ENGINEER at least 3 days in advance of each <br />equipment test. <br />C. The CONTRACTOR shall furnish all personnel, power, and all other necessary <br />equipment, facilities, and services required for conducting the tests. <br />1.3 SYSTEM STARTUP <br />A. The CONTRACTOR shall coordinate the startup and testing of the Security <br />Management System. <br />B. It is not the intent of the ENGINEER to instruct the CONTRACTOR in the startup of <br />the system; however, the ENGINEER will be available prior to and during startup to <br />provide technical support to the CONTRACTOR. <br />C. The CONTRACTOR shall immediately correct all defects in materials or workmanship <br />that appear during this test period. Time lost for equipment repairs, wiring corrections, <br />control point settings, or other reasons which actually interrupt the startup may, at the <br />discretion of the ENGINEER, be justifiable cause for extending the startup test <br />duration. <br />D. During the startup, the CONTRACTOR shall keep records of the operations, in <br />accordance with the instructions of the ENGINEER. <br />1.3 THIRTY DAY ACCEPTANCE TEST <br />City of Santa Ana Equipment Testing and System Startup <br />Security Management System Project Page 01660-1 <br />SantaAna_SMS_01660 <br />