My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SecSol
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SecSol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:27:40 PM
Creation date
6/23/2005 9:30:38 AM
Metadata
Fields
Template:
Contracts
Company Name
SecSol Inc, dba Security Solutions
Contract #
A-2005-113
Agency
Public Works
Council Approval Date
6/6/2005
Insurance Exp Date
3/20/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01700 — PROJECT CLOSEOUT <br />PART 1 — GENERAL <br />1.1 FINAL CLEANUP <br />A. The CONTRACTOR shall promptly remove from the vicinity of the completed work, all <br />rubbish, unused materials, concrete forms, construction equipment, and temporary <br />structures and facilities used during construction. Final acceptance of the WORK by <br />the CITY will be withheld until the CONTRACTOR has satisfactorily complied with the <br />foregoing requirements for final cleanup of the project site. <br />1.2 CLOSEOUT TIMETABLE <br />A. The CONTRACTOR shall establish dates for equipment testing, acceptance periods, <br />and on -site instructional periods (as required under the Contract). Such dates shall be <br />established not less than one week prior to beginning any of the foregoing items, to <br />allow the CITY, the ENGINEER, and their authorized representatives sufficient time to <br />schedule attendance at such activities. <br />1.3 NOT USED <br />1.4 FINAL SUBMITTALS <br />A. The CONTRACTOR, prior to requesting final payment, shall obtain and submit the <br />following items to the ENGINEER for transmittal to the CITY: <br />Written guarantees, where required. <br />2. Operating manuals and instructions. <br />3. New permanent cylinders and key blanks for all locks. <br />4. Maintenance stock items; spare parts; special tools. <br />5. Completed record drawings. <br />6. Releases from all parties who are entitled to claims against the subject project, <br />property, or improvement pursuant to the provisions of law. <br />1.5 MAINTENANCE AND GUARANTEE <br />A. The CONTRACTOR shall comply with the maintenance and guarantee requirements <br />contained in the General Conditions. <br />B. Replacement of earth fill or backfill, where it has settled below the required finish <br />elevations, shall be considered as a part of such required repair work, and any repair <br />or resurfacing constructed by the CONTRACTOR which becomes necessary by <br />reason of such settlement shall likewise be considered as a part of such required <br />repair work unless the CONTRACTOR shall have obtained a statement in writing <br />City of Santa Ana Project Closeout <br />Security Management System Project Page 01700-1 <br />SantaAna_SMS_01700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.