Laserfiche WebLink
SECTION 01700 — PROJECT CLOSEOUT <br />PART 1 — GENERAL <br />1.1 FINAL CLEANUP <br />A. The CONTRACTOR shall promptly remove from the vicinity of the completed work, all <br />rubbish, unused materials, concrete forms, construction equipment, and temporary <br />structures and facilities used during construction. Final acceptance of the WORK by <br />the CITY will be withheld until the CONTRACTOR has satisfactorily complied with the <br />foregoing requirements for final cleanup of the project site. <br />1.2 CLOSEOUT TIMETABLE <br />A. The CONTRACTOR shall establish dates for equipment testing, acceptance periods, <br />and on -site instructional periods (as required under the Contract). Such dates shall be <br />established not less than one week prior to beginning any of the foregoing items, to <br />allow the CITY, the ENGINEER, and their authorized representatives sufficient time to <br />schedule attendance at such activities. <br />1.3 NOT USED <br />1.4 FINAL SUBMITTALS <br />A. The CONTRACTOR, prior to requesting final payment, shall obtain and submit the <br />following items to the ENGINEER for transmittal to the CITY: <br />Written guarantees, where required. <br />2. Operating manuals and instructions. <br />3. New permanent cylinders and key blanks for all locks. <br />4. Maintenance stock items; spare parts; special tools. <br />5. Completed record drawings. <br />6. Releases from all parties who are entitled to claims against the subject project, <br />property, or improvement pursuant to the provisions of law. <br />1.5 MAINTENANCE AND GUARANTEE <br />A. The CONTRACTOR shall comply with the maintenance and guarantee requirements <br />contained in the General Conditions. <br />B. Replacement of earth fill or backfill, where it has settled below the required finish <br />elevations, shall be considered as a part of such required repair work, and any repair <br />or resurfacing constructed by the CONTRACTOR which becomes necessary by <br />reason of such settlement shall likewise be considered as a part of such required <br />repair work unless the CONTRACTOR shall have obtained a statement in writing <br />City of Santa Ana Project Closeout <br />Security Management System Project Page 01700-1 <br />SantaAna_SMS_01700 <br />