My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - MAIN STREET H20 IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
07/05/2005
>
23A - MAIN STREET H20 IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:53:50 PM
Creation date
6/28/2005 10:18:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
7/5/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Rejection of Bids for Main <br />Street Water Main Improvements <br />July 5, 2005 <br />Page 2 <br /> <br />Name of Bidder <br /> <br />1. <br />2. <br />3. <br /> <br />Engineered Plumbing, Inc. <br />A.R. Sarmiento, Inc. <br />Dominguez General Engineering <br />Construction <br />R & L Sewers <br />J. De Sigio Construction, Inc. <br />Herman Weigsker, Inc. <br />John T. Malloy, Inc. <br />Robert G. Castonogia, Inc. <br /> <br />City <br /> <br />Bid Amount <br /> <br />4. <br />5. <br />6. <br />7. <br />8 . <br /> <br />Baldwin park <br />La Mirada <br />Rosemead <br /> <br />$354,270.00 <br />$363,165.00 <br />$364,160.00 <br /> <br />Paramount <br />Downey <br />Bloomington <br />Los Angeles <br />Downey <br /> <br />$420,660.00 <br />$422,840.00 <br />$475,795.17 <br />$494,840.00 <br />$671,567.00 <br /> <br />A total of eight bids were submitted and all were responsive. Engineered <br />Plumbing, Inc. submitted the lowest responsive bid for $354,270, which is <br />substantially above the Engineer I s estimate of $292,520. Because the <br />bids received were higher than estimates, Staff recommends rejection of <br />all bids in order to revise the scope of work so that bids received will <br />be within the available budget. The project will be re-advertised for <br />bids after the redesign is completed. <br /> <br />ENVIRONMENTAL IMPACT <br /> <br />There is no environmental impact associated with this action. <br /> <br />FISCAL IMPACT <br /> <br />There is no fiscal impact associated with this action. <br /> <br /> <br />10 <br /> <br />~ <br /> <br /> <br />James G. Ross <br />Executive Director <br />Public Works Agency <br /> <br />pwa_f_serv\Engineering\Construction\RFCA-draft\05-3197 reject and re-adv 2005-07-05 50 WD <br /> <br />23A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.