Laserfiche WebLink
<br />MacArthur Place South Findings and Facts in Support of Findings <br />Environmental Impact Report <br /> <br />4.1.5.1 Potentiallv Significant Adverse Impacts To The State Route SR-55 Southbound On- <br />Ramp At MacArthur Boulevard <br /> <br />As described in Section 5.11 in the ErR, the long-term operation of the MacArthur Place South <br />project would result in significant adverse traffic impacts at the SR-55 Southbound On-Ramp at <br />MacArthur Boulevard. <br /> <br />Finding Related to Impacts To The Southbound SR-55 On-Ramp at MacArthur Boulevard <br /> <br />Specific economic, legal, social, technological or other considerations make infeasible the <br />mitigation measures or project alternatives identified in the Final EIR to reduce unavoidable <br />significant impacts to a level that would be less than significant. <br /> <br />Facts in Support of the Finding Related to Impacts To The State Route SR-55 Southbound On- <br />Ramp At MacArthur Boulevard <br /> <br />The proposed project would be required to contribute a fair share of funds for improvements to <br />the Southbound Sr-55 On-Ramp to reduce potentially significant impacts to a level considered <br />less than significant. However, at this time there is no specific funding program or time frame to <br />implement the improvements. Because of the uncertainty then the improvements would occur, <br />the impacts to the southbound SR-55 On-Ramp would be considered an unavoidable significant <br />impact. <br /> <br />Level of Significance ofImpacts Related to Impacts To The State Route SR-55 Southbound On <br />-Ramp At MacArthur Boulevard. <br /> <br />The project traffic impacts at the southbound SR-55 On-Ramp at MacArthur Boulevard cannot <br />be mitigated to below a level of significance. <br /> <br />4.1.5.2 Potentiallv Significant Adverse Impacts To The State Route SR-55 Northbound On- <br />Ramp At MacArthur Boulevard <br /> <br />As described in Section 5.11 in the EIR, the long-term operation of the MacArthur Place South <br />project would result in significant adverse traffic impacts at the SR-55 Northbound On-Ramp at <br />MacArthur Boulevard. <br /> <br />Finding Related to Impacts To The Southbound SR-55 On-Ramp at MacArthur Boulevard <br /> <br />Specific economic, legal, social, technological or other considerations make infeasible the <br />mitigation measures or project alternatives identified in the Final EIR to reduce unavoidable <br />significant impacts to a level that would be less than significant. <br /> <br />Facts in Support of the Finding Related to Impacts To The State Route SR-55 Northbound On- <br />Ramp At MacArthur Boulevard <br /> <br />Exhibit B <br />Page 12 of38 <br /> <br />Page 12 <br />