Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Section-5.8 Noise <br /> <br />The ErR text on Page 254, Section 5.8, Noise at paragraph 2, line 5 will be revised to note that: <br /> <br />All residential units in this zone are inconsistent are unacceptallle in this area unless it ean Ile <br />shewn cenelllsiyely that sueh unitG are sufficiently appropriatelv sound attenuated for present and <br />projected noise exposures, which shall be the energy sum of all noise impacting the project, so as <br />not to exceed an interior standard of 45 dB CNEL. <br /> <br />Mitigation Measures N-2 and N-3 on page 271 contained typographical errors and are corrected herein. <br /> <br />N-2 Prior to issuance of building permits, building plans shall specify the STC rating of <br />windows and doors for all residential land uses. Window and door rating shall be sufficient <br />to reduce the interior noise level to a CNEL of 45 dB ~ or less, and shall be determined <br />by a qualified acoustical consultant as part of the final engineering design of the project. <br /> <br />N-3 Prior to building occupancy mechanical ventilation shall be installed at the proposed <br />condominiums and residential towers since the interior CNEL standard of 45 dB ~ is <br />to be met with all windows and doors closed. <br /> <br />Mitigation Measure N-8 on page 272 has been revised and is incorporated by reference into the Final EIR. <br /> <br />N-8 <br /> <br />During construction activities, the project developer shall ensure that all pile-driving <br />equipment shall be enclosed on all sides with an acoustical blanket barrier that provides a <br />minimum sound transmission class (STC) rating 000. The height of the blanket enclosure <br />shall be at least 20-feet. With the exception of points of access to the enclosure area, there <br />shall be no openings or gaps in the enclosure and all points of access are to remain closed <br />during pile driving activities. No pile driving activity shall occur before 8:00 a.m. on <br />Saturdavs. <br /> <br />Mitigation Measure N-12 on page 273 contained typographical errors and are corrected herein. <br /> <br />N-12 Prior to issuance of occupancy permits, the project developer, at the project developer's <br />sole expense, shall conduct a noise monitoring analysis to ensure that residential units <br />achieve an interior noise level of 45 dB ~ CNEL. The analysis shall be conducted by a <br />qualified acoustical consultant and shall be submitted to the City's Building and Planning <br />Agency for review. <br /> <br />Section 5.11- Transportation and Traffic <br /> <br />The text in Section 5.11.1 on page 293 of the DE1R contained a typographical error. The text is revised to <br />read as follows: <br /> <br />The proposed project consists of the demolition of an existing restaurant and theater, relinquishing <br />the approved entitlement for a n In-room hotel, and construction of three 25-story residential <br />towers, three 5-/6-story residential buildings, a cinema loft building, and 23,871 square feet of <br />commercial development. <br /> <br />Exhibit C <br />