Laserfiche WebLink
<br />23. Signage to direct customers and guests to the adjacent parking structure <br />shall be provided. A directional sign plan needs to be submitted and <br />approved by the Planning Manager prior to issuance of a certificate of <br />occupancy. <br />24. Construction workers for the project shall be prohibited from parking in the <br />adjacent neighborhoods. <br /> <br />25. Prior to issuance of building permits, a Waste Management Plan shall be <br />submitted to the Planning Manager for approval. The plans shall include <br />information on items such as pick-up, delivery, and types of bins required. <br /> <br />Mitiaation Measures <br /> <br />26. Prior to issuance of building permits, the project developer shall ensure <br />that the building plans reflect the following information: outdoor lighting <br />fixtures adjacent to exterior doors and within walkways and parking lots <br />shall generate a minimum 1.0 foot candle level of light during normal <br />operation hours. During non-operating hours, outdoor lighting fixtures <br />shall generate no less than .25 foot candle level of light. All lighting shall <br />be directed towards the interior of the project site. <br /> <br />27. Prior to issuance of building permits, building plans for the proposed <br />project shall reflect the use of non-reflective building materials to minimize <br />light and glare impacts. <br /> <br />28. Prior to the issuance of building permits, a Final Landscape Plan for each <br />building component of the project shall be approved by the City of Santa <br />Ana Planning and Building Agency. The Final Landscape Plan shall be <br />based on the conceptual landscape plan included in the EIR. <br /> <br />29. Prior to issuance of Certificate of Occupancy Permits, the required <br />landscaping for each building component of the project shall be installed <br />to the satisfaction of the City of Santa Ana Planning Department. <br /> <br />30. Prior to the issuance of a building permit, the project developer shall <br />provide the Planning Manager plans that incorporate lighting and any <br />other conditions in the manner required by the FAA during the <br />construction phase (e.g. for the cranes) and after completion. <br /> <br />31. Pursuant to state law, prior to issuance of a certificate of a use and <br />occupancy permit, the project proponent shall provide evidence to the City <br />of Santa Ana that a Notice of Airport in the vicinity has been recorded on <br />the deed for each residential unit and shall remain so recorded so as long <br />as the airport is in operation. <br /> <br />Exhibit "A" <br />Page 4 of 15 <br />