My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-064 - Approving Conditional Use Permit No. 2005-10
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-064 - Approving Conditional Use Permit No. 2005-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 12:09:56 PM
Creation date
6/28/2005 3:01:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-064
Date
6/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />97. Prior to issuance of grading permits, the project developer shall <br />demonstrate to the City of Santa Ana that construction-related waste <br />generated on-site would be recycled wherever feasible as the first choice <br />of disposal method, leaving the option of landfill disposal as a last <br />alternative. The proposed commercial uses shall incorporate facilities for <br />collection and pick-up of recyclable materials into the design of the project. <br /> <br />98. Prior to issuance of grading permits, the project developer shall coordinate <br />with the Santa Ana Water Division to determine the exact location of all <br />existing underground water supply facilities and take action to prevent <br />damage to these facilities to be left on the project site or interfere with their <br />operation. The project developer shall pay their fair share amount for the <br />necessary facilities to accommodate project-related water supplies. <br /> <br />99. Prior to issuance of building permits, the existing eight-inch sewer line <br />along Hutton Centre Drive north of Sandpointe Avenue, shall be replaced <br />with a new 10-inch sewer line. <br /> <br />100. Prior to issuance of grading permits, the project developer shall coordinate <br />with Waste Management on the type and location of facilities needed to <br />provide solid waste disposal service to the project site. <br /> <br />101. Prior to issuance of grading permits, the project developer shall perform <br />soil testing to determine is soil to be excavated from the site will require <br />off-site disposal. If the soil is found to be contaminated, it will be properly <br />disposed of in compliance with California environmental laws, regulations <br />and policies. <br /> <br />B. Police Department <br /> <br />1. A security plan must be submitted to the Police Department at the plan <br />check stage for approval. The plan must cover all aspects of the projects <br />security including security personnel, surveillance equipment, and <br />hardware. The project will be required to have a minimum of four state <br />licensed uniformed security personnel. One security officer will be <br />required for each building, one for the podium level and one for the <br />parking garage. <br /> <br />2. A minimum 12-inch shatterproof convex mirror shall be installed at each <br />stair landing. All doors leading into stairwells shall be equipped with a <br />minimum 5-inch by 20-inch fire rated window. The last flight of stairs shall <br />be fully enclosed at its base. <br /> <br />3. The City of Santa Ana parking structure design standards shall be <br />followed in its entirety. Duress alarms allowing voice communication with <br /> <br />Exhibit "A" <br />Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.