Laserfiche WebLink
<br />80. Prior to issuance of building permits, the project developer shall submit a <br />Construction Phasing Plan to Santa Ana Fire Department. The plan must <br />be consistent with the Fire Department Fire Code requirements and must <br />show that emergency access to the construction site is adequate. <br /> <br />81. Prior to issuance of building permits, the project developer shall provide <br />evidence to the Santa Ana Fire Department that the proposed fire <br />protection and life saving systems incorporated in the project are <br />adequate. <br /> <br />82. Prior to issuance of building permits, the project developer shall submit the <br />final design of the project, including fire sprinklers system design to the <br />Santa Ana Fire Department for approval. <br /> <br />83. Prior to issuance of building permits, the project developer shall <br />coordinate with the Santa Ana Fire Department and the Santa Ana Police <br />Department regarding possible radio interference and installation of radio <br />repeaters on a tower rooftop. <br /> <br />84. Prior to issuance of building occupancy permits, the project developer in <br />cooperation with the City of Santa Ana, shall provide for the restriping of <br />the outside southbound through lane at the intersection of Main Street and <br />Sunflower to a shared through and right turn lane. <br /> <br />85. Prior to issuance of building occupancy permits, the project developer in <br />cooperation with the City of Santa Ana, shall provide for the restriping the <br />shared through right-turn lane at Hutton Centre Drive and MacArthur <br />Boulevard to provide an exclusive through lane and construct a second <br />northbound right turn lane for the northbound traffic. <br /> <br />86. Prior to issuance of building occupancy permits, the project developer <br />shall pay for the construction of a third eastbound through lane on <br />MacArthur Boulevard between Hutton Centre Drive/Imperial Promenade <br />and the SR-55 northbound on-ramp. <br /> <br />87. Prior to the issuance of building occupancy permits, the project developer <br />in cooperation with the City of Santa Ana, shall provide for the installation <br />of a traffic signal at Hutton Centre Drive and Hutton Centre Loop. <br /> <br />88. Prior to issuance of building occupancy permits, the project developer <br />shall pay for the construction of a fourth eastbound lane on MacArthur <br />Boulevard between Hutton Centre Drivellmperial Promenade and the SR- <br />55 southbound on-ramp. <br /> <br />Exhibit "A" <br />Page 12 of 15 <br />