Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br />32. During construction and grading activities, the developer's construction <br />contractor shall comply with the measures set forth in the Storm Water <br />Pollution Prevention Plan (SWPPP) to ensure that airborne dust is kept to a <br />minimum. <br /> <br />33. Prior to issuance of building permits and to the extent feasible, building plans <br />for the proposed project shall reflect the use of the following measures. <br /> <br />. Use low-polluting high energy-efficient appliances <br />. Install solar panels on roofs to supply electricity for heating and cooling <br />. Use double-paned windows to reduce thermal loss <br />. Install automatic lighting on/off controls and energy-efficient lighting <br />. Use light colored roofing materials in new construction to deflect heat <br />away from buildings. <br /> <br />34. During grading operations special handling of on-site soils shall be <br />required, due to the high moisture content of the soils, which is well above <br />optimum moisture conditions. The City of Santa Ana shall monitor the <br />grading contractor to ensure stabilization of the soils during grading prior <br />to placing and compacting fill soils over wet sub-grade soils, as <br />recommended in the geotechnical investigation prepared by Geotechnical <br />Professionals, Inc. <br /> <br />35. Prior to issuance of building permits, the project developer shall ensure <br />that pile foundations are incorporated into the project design to mitigate <br />the potential settlement hazards beneath the proposed buildings. Pile <br />foundations shall be installed according to the recommendations provided <br />in the project geotechnical report. <br /> <br />36. Prior to issuance of building permits, the project developer shall ensure <br />that the subterranean portion of the structures is designed and installed to <br />resist hydrostatic pressure and be a water-proof barrier between the <br />existing soils and subterranean portions of the buildings. This design and <br />installation shall be consistent with the recommendations provided in the <br />project geotechnical report. <br /> <br />37. Prior to initiation of project grading, the project developer shall ensure that <br />all existing utilities will be relocated, abandoned and removed, rerouted, or <br />protected in coordination with the project developer and affected utility <br />companies. <br /> <br />38. Prior to issuance of a grading permit for project construction, the project <br />developer shall ensure that a Final Geotechnical Report on the project site <br />is prepared. All recommendations from this Final Geotechnical Report <br />shall be incorporated into the final grading plan for the project. <br /> <br />Exhibit "A" <br />Page 6 of 15 <br />