Laserfiche WebLink
<br />precautions shall be taken during demolition in compliance with California <br />environmental laws, regulations and policies. <br /> <br />47. Prior to occupancy of residential units, the project developer shall ensure <br />that CC&Rs for the community homeowners associations are recorded <br />specifying maintenance responsibilities for all BMP's identified in the <br />Water Quality Management Plan. <br /> <br />48. Prior to issuance of a grading permit for the project, the project developer <br />shall prepare and submit a Notice of Intent (NOI) to the State Water <br />Resources Control Board (SWRCB). The developer will also submit the <br />NOI and the project Water Discharge identification Number (WDIN) <br />provided by the SWRCB to the City of Santa Ana City Engineer. <br /> <br />49. During all site preparation, grading and construction, the project developer <br />shall ensure that the project contractor complies with all applicable <br />requirements of the NPDES permit, the Drainage Area Management Plan <br />(DAMP), and the City's Local Implementation Plan (LIP). BMP's from the <br />DAMP and the LIP will be implemented by the project contractors, as <br />appropriate during site preparation, grading and construction. <br /> <br />50. Prior to issuance of a grading permit, the project developer shall prepare a <br />Final Storm Water Pollution Prevention Plan (SWPPP). This plan shall be <br />submitted and approved by the City Engineer prior to initiation of any <br />grading activity. The project shall maintain the SWPPP on the <br />construction site throughout the construction period. <br /> <br />51. During all site preparation, grading and construction, the project developer <br />shall ensure that its contractor implements the provisions of the SWPPP. <br /> <br />52. Prior to the issuance of grading permits, the project developer shall submit <br />a Final Water Quality Management Plan (WQMP) based on the Final <br />Grading Plan, to be approved by the City's Director of Public Works. The <br />WQMP shall be consistent with the DAMP and shall contain provisions <br />and BMP's for construction and operation conditions. <br /> <br />53. Prior to the issuance of building permits, the project developer shall pay <br />the City's drainage impact fee. <br /> <br />54. Prior to the issuance of grading permits, the project developer shall verify <br />that structural BMP's have been permanently incorporated into project <br />plans. Such BMP's shall ensure that pollutants from project-related storm <br />water runoff are mitigated consistently with applicable state and local <br />standards. <br /> <br />Exhibit "A" <br />Page 8 of 15 <br />