My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-064 - Approving Conditional Use Permit No. 2005-10
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-064 - Approving Conditional Use Permit No. 2005-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 12:09:56 PM
Creation date
6/28/2005 3:01:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-064
Date
6/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Delivery truck drivers shall be encouraged to minimize acceleration and <br />maintain reduced vehicle speeds while onsite. <br /> <br />63. Demolition and construction plans for the proposed project shall reflect the <br />following note: "During demolition and construction, the contractor shall <br />adhere to all City Noise Ordinance requirements to limit all construction <br />activity, including equipment start-up, to between the hours of 7:00 a.m. <br />and 8:00 p.m. Mondays through Saturdays. No construction shall take <br />place on Sundays or federal holidays. <br /> <br />64. During demolition and construction, the contractor shall site all <br />construction staging and storage areas away from sensitive receptors to <br />the furthest extent possible. <br /> <br />65. During construction activities, the project developer shall ensure that all <br />pile driving equipment shall be enclosed on all sides with an acoustical <br />blanket barrier that provides a minimum sound transmission class (STC) <br />rating of 30. The height of the blanket enclosure shall be at least 20 feet. <br />With the exception of points of access to the enclosure area, there shall <br />be no openings or gaps in the enclosure, and all points of access are to <br />remain closed during pile driving activities. Notwithstanding Mitigation <br />Measure No. 62, pile driving shall not commence prior to 8:00 a.m. on <br />Saturday. <br /> <br />66. Prior to issuance of grading or demolition permits, the project developer <br />shall submit a construction equipment staging plan to the City of Santa <br />Ana for approval. <br /> <br />67. Prior to the start of construction activity, the project developer shall post <br />the name and telephone number of the construction relations officer on- <br />site. <br /> <br />68. Prior to any site preparation, grading or construction, the project contractor <br />shall provide to resident associations in the Sandpointe neighborhood, the <br />Main Attraction Condominiums and the Pinnacle Apartments a project <br />schedule indicating the type of construction activity and duration, <br />construction staging areas and the name and telephone number of the <br />construction relations officer. <br /> <br />69. Prior to issuance of occupancy permits, the project developer, at the <br />project developer's sole expense, shall conduct a noise monitoring <br />analysis to ensure that residential units achieve an interior noise level of <br />45 dB CNEL. The analysis shall be conducted by a qualified acoustical <br />consultant and shall be submitted to the City's Planning and Building <br />Agency for review. <br /> <br />Exhibit "A" <br />Page 10 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.