Laserfiche WebLink
<br />. <br /> <br />88. <br /> <br />89. <br /> <br />90. <br /> <br />91. <br /> <br />. <br /> <br />electrical facilities. All electrical facilities and associated structures to be <br />left on the project site shall be protected from damage. <br /> <br />Prior to issuance of grading permits, the project developer shall ensure <br />that grading plans reflect the under grounding of utility lines serving the <br />proposed project. <br /> <br />Prior to issuance of grading permits, the project developer shall coordinate <br />with Southern California Gas to determine the exact location of all <br />underground natural gas facilities. All gas pipelines and associated <br />structures to be left on the project site must be protected from damage. <br /> <br />Prior to issuance of grading permits, the project developer shall coordinate <br />with Adelphia Communications to determine the exact location of all <br />underground cable facilities. The developer shall protect all existing cable <br />lines and associated structures to be left on the project site for damage. <br /> <br />Prior to issuance of grading permits, the project developer shall coordinate <br />with SBC Communications (formerly Pacific Bell) to determine the exact <br />location of all underground telephone facilities. The developer shall <br />protect all existing telephone lines and associated structures to be left on <br />the project site from damage. <br /> <br />92. Prior to issuance of grading permits, the project developer shall <br />demonstrate to the City of Santa Ana that construction-related waste <br />generated on-site would be recycled wherever feasible as the first choice <br />of disposal method, leaving the option of landfill disposal as a last <br />alternative. The proposed commercial uses shall incorporate facilities for <br />collection and pick-up of recyclable materials into the design of the project. <br /> <br />93. Prior to issuance of grading permits, the project developer shall coordinate <br />with the Santa Ana Water Division to determine the exact location of all <br />existing underground water supply facilities and take action to prevent <br />damage to these facilities to be left on the project site or interfere with their <br />operation. The project developer shall pay their fair share amount for the <br />necessary facilities to accommodate project-related water supplies. <br /> <br />94. Prior to issuance of building permits, the existing eight-inch sewer line <br />along Hutton Centre Drive, north of Sandpointe Avenue shall be replaced <br />with a new 10-inch sewer line. <br /> <br />95. Prior to issuance of grading permits, the project developer shall coordinate <br />with Waste Management on the type and location of facilities needed to <br />provide solid waste disposal service to the project site. <br /> <br />. <br /> <br />Exhibit "C" <br />Page 13 of 14 <br />