My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-064 - Approving Conditional Use Permit No. 2005-10
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-064 - Approving Conditional Use Permit No. 2005-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 12:09:56 PM
Creation date
6/28/2005 3:01:57 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-064
Date
6/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />MacArthur Boulevard or Main Street adjacent to the project site shall <br />also be cleaned each day. <br /> <br />. <br /> <br />All material transported off-site shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. Haul trucks <br />leaving the site shall have a minimum freeboard distance of 12- <br />inches. <br /> <br />. <br /> <br />Construction equipment leaving the project site shall be wheel <br />washed. <br /> <br />. <br /> <br />The amount of area disturbed by clearing and earthwork activities <br />shall be minimized at all times. <br /> <br />. <br /> <br />Equipment engines shall be maintained in good condition and in <br />proper tune according manufacturer's specifications. <br /> <br />. <br /> <br />To the extent feasible, construction equipment shall use alternative <br />clean fuels such as compressed natural gas equipment with <br />oxidation catalysts. If alternative clean fuels are not feasible, <br />gasoline powered construction equipment shall be used. <br /> <br />. <br /> <br />Construction equipment operating on diesel fuel shall use <br />particulate filters or low sulfur diesel. <br /> <br />. To the extent feasible construction operations shall use electricity <br />from power poles in-lieu of temporary diesel or gasoline-powered <br />generators. <br /> <br />29. Prior to commencement of construction activities, the project developer shall <br />identify to the City a construction relations officer to act as a community <br />liaison concerning on-site activity, including resolution of issues related to <br />dust generation from grading/paving activities. A publicly visible sign shall <br />be posted with the name of construction relations officer and a telephone <br />number. <br /> <br />30. During finish work, the construction contractor shall ensure the minimization <br />of ROG emissions. Building plans for the project shall specify and require <br />the use of pre-coated building materials, use of high pressure-low volume <br />(HPLV) paint applicators with 50 percent efficiency, and use of lower <br />volatility paint not to exceed 100 grams of ROG per liter. <br /> <br />31. During construction and grading activities, the developer's construction <br />contractor shall comply with the measures set forth in the Storm Water <br />Pollution Prevention Plan (SWPPP) to ensure that airborne dust is kept to a <br />minimum. <br /> <br />. <br /> <br />Exhibit "0" <br />Page 5 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.