Laserfiche WebLink
<br />the outside southbound through lane at the intersection of Main Street and <br />Sunflower to a shared through and right turn lane. <br /> <br />79. Prior to issuance of building occupancy permits, the project developer in <br />cooperation with the City of Santa Ana, shall provide for the restriping the <br />shared through right-turn lane at Hutton Centre Drive and MacArthur <br />Boulevard to provide an exclusive through lane and construct a second <br />northbound right turn lane for the northbound traffic. <br /> <br />80. Prior to issuance of building occupancy permits, the project developer <br />shall pay for the construction of a third eastbound through lane on <br />MacArthur Boulevard between Hutton Centre Drive/Imperial Promenade <br />and the SR-55 northbound on-ramp. <br /> <br />81. Prior to the issuance of building occupancy permits, the project developer <br />in cooperation with the City of Santa Ana, shall provide for the installation <br />of a traffic signal at Hutton Centre Drive and Hutton Centre Loop. <br /> <br />82. Prior to issuance of building occupancy permits, the project developer <br />shall pay for the construction of a fourth eastbound lane on MacArthur <br />Boulevard between Hutton Centre Drive/Imperial Promenade and the SR- <br />55 southbound on-ramp. <br /> <br />83. Prior to issuance of building occupancy permits, the project developer <br />shall contribute $200,000 for the City of anta Ana to prepare a <br />neighborhood traffic study to assess any intrusion of project traffic into the <br />Sandpointe Neighborhood. If traffic intrusion is attributable to the project, <br />corrective measures could include forced-turn channelization, semi- <br />diverters, diagonal diverters and cul-de-sacs. <br /> <br />84. Prior to issuance of building occupancy permits, the project developer <br />shall develop a parking plan in cooperation with the City of Santa Ana to <br />ensure that parking needs are met. <br /> <br />85. Prior to issuance of building occupancy permits the project developer shall <br />pay a fair-share contribution for restriping a second eastbound right-turn <br />lane the intersection of Main Street and Sunflower in order to achieve LOS <br />D for 2025. <br /> <br />86. Prior to issuance of grading permits, the project developer shall coordinate <br />with SCE to determine the exact location of all underground and overhead <br />electrical facilities. All electrical facilities and associated structures to be <br />left on the project site shall be protected from damage. <br /> <br />Exhibit "AU <br />Page 12 of 15 <br />