My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSTA MESA, CITY OF 1A-2005
Clerk
>
Contracts / Agreements
>
C
>
COSTA MESA, CITY OF 1A-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:13:35 PM
Creation date
7/19/2005 1:47:47 PM
Metadata
Fields
Template:
Contracts
Company Name
City of Costa Mesa Police Department
Contract #
A-2004-176-10-1
Agency
Police
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br /> <br />CITY OF COSTA MESA <br /> <br />P.O BOX 1200 <br /> <br />CALIFORNIA 92628.1200 <br /> <br />FROM THE OFFICE OF JOHN D. HENSLEY, CHIEF OF POLICE <br /> <br />April 20, 2005 <br /> <br />Captain George Saadeh <br />Santa Ana Police Department <br />60 Civic Center Plaza <br />Santa Ana, CA 92702 <br /> <br />Dear Captain Saadeh, <br /> <br />On the 18th of February 2005, the City of Santa Ana and the City of Costa Mesa <br />entered into an agreement to transfer or purchase equipment or services for <br />FY04, Urban Area Security Initiative (UASI). The agreement included <br />$128.000.00 in funding for security gates and fencing for the Costa Mesa Police <br />Department and Costa Mesa Fire Station #5 facilities. The project included <br />erecting security gates to both the rear vehicle entrances that access police and <br />fire vehicle parking areas, as well as employee parking for both of the facilities. <br />Pedestrian gates were also being included in the project. The vehicle and <br />pedestrian gates would be accessed using card reader devices. Security <br />camer,as would be added to an existing system that would provide the necessary <br />visibility to the parking areas and gate access points. <br /> <br />The company that provided the quotation for the project was Siemens, a <br />company that has installed other security systems throughout the City. Due to <br />time constraints, at the time of applying for the UASI Grant the Siemens <br />quotation was the only benchmark that could be used to estimate the cost of <br />securing the Police and Fire facility. <br /> <br />Since the time of entering into the agreement with the City of Santa Ana on this <br />project, a more specific project cost estimate was obtained from Meyer & Allen <br />Associates, the architectural firm the City of Costa Mesa has used for other <br />projects in the City. Meyer & Allen Associates estimate was for $173,648 for the <br />project. This estimate included more specific information and costs associated <br />with the project. Refer to the attached estimate for more specific details. <br /> <br />On April 19, 2005, Lt. Allen Huggins (Security Gate and Fencing Project Manager <br />for City of Costa Mesa) spoke to Sgi:. Brian Sheldon (UASI Grant Coordinator for <br />City of Santa Ana) about the project. Sgt. Sheldon indicated that the agreement <br />to transfer or purchase equipment or services for FY04, Urban Area Security <br /> <br />EXHIBIT A 1 <br /> <br />www.ci.cosla.mesa.ca.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.