My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. 2 - 2005
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. 2 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:58:38 PM
Creation date
7/19/2005 3:56:21 PM
Metadata
Fields
Template:
Contracts
Company Name
Tetra Tech, Inc
Contract #
A-2005-142
Agency
Public Works
Council Approval Date
6/20/2005
Expiration Date
6/30/2007
Insurance Exp Date
10/1/2008
Notes
Amended by A-2006-107
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TASK F - Plan Check and Permits <br /> <br />Tetra Tech will coordinate, administer and apply for all necessary permits. We have included within <br />our proposal provisions for plan revisions, clarifications, meetings and time constraints necessary to <br />obtain the Building and Electrical Permit from the City of Santa Ana. The City will be responsible for <br />all permit fees and will assist in processing plans for the issued City permits. <br /> <br />TASK G - OCSD Coordination <br /> <br />Since the lift station will discharge into OCSD trunk sewer in Bristol Street, Tetra Tech will <br />coordinate the requirements and obtain the necessary approval from OCSD. <br /> <br />CONSTRUCTION PHASE SUPPORT <br /> <br />TASK A - Bid Period <br /> <br />Tetra Tech will respond to questions on the Plans and Specifications during the bid period. <br /> <br />TASK B - Pre-Construction Meeting <br /> <br />Tetra Tech will attend a pre-construction meeting. <br /> <br />TASK C - Shop Drawings <br /> <br />Tetra Tech will review shop drawings, equipment specifications, samples and other submittals for <br />compliance with the Plans and Specifications. For this proposal, we have assumed a total of forty (40) <br />submittals and included budget for a second review of each shop drawing submittal if necessary. <br /> <br />TASKD-RFIs <br /> <br />Tetra Tech will respond to Contractor's Requests for Information (RFI) and provide clarifications of <br />the Plans and Specifications during the construction process. For this proposal, we have assumed a <br />total of ten (10) RFIs will need to be responded to. <br /> <br />TASK E - Change Orders <br /> <br />Tetra Tech will evaluate and respond to Contractor's request for change orders. For this proposal, we <br />have assumed a total offive (5) change orders will need our attention. <br /> <br />TASK F - Periodic Site Visits <br /> <br />Tetra Tech will perform periodic site visits during construction to review progress and attend <br />construction meetings. For this proposal, we have assumed that a total of three (3) site visits to resolve <br />issues will be required. In addition, we have assumed that we will be requested to attend one meeting <br />per month for a duration of six months for a total of six (6) meetings. <br /> <br />CITY OF SANTA ANA <br />San Lorenzo Sewer Lift Station. <br /> <br />TETRA TECH, INC. <br /> <br />lD <br />
The URL can be used to link to this page
Your browser does not support the video tag.