Laserfiche WebLink
<br />". ""' <br /> <br />A DATE: 2002-06-1. <br />ESTIMATE OF MATE~ FORCE ACCOUNT WORK <br />BY THE <br />UNION PACIFIC RAILROAD <br /> <br />DESCRIPTION OF WORK: <br />INSTALL SIMULTANEOUS PRE-EMPTION IN EXISTING CASES_ AT MAIN ST, DYER ROAD <br />AND FLOWER ST. IN SANTA ANA, CA. M.P. 519.40 ON THE SANTA ANA IND. LEAD <br />SIGNAL PROJECT MANAGER: LEE BURDEN 935-7680 <br />RAILROAD TO PERFORM ALL WORK / COST DISTRIBUTED 'AS FOLLOWS: <br />SIGNAL - CITY OF SANTA ANA 100% RECOLLECTIBLE <br /> <br />PID: 43900 AWO: <br />SERVICE UNIT: 20 CITY: DYER <br /> <br />MP,SUBDIV: 519.40, SANTAANA <br />STATE: CA <br /> <br />. ' <br />TIlE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN TIlE EVENT OF <br />AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR, REQUIRED, <br />UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT TIlE CURRENT EFFECTIVE RATE. <br /> <br />"- <br /> <br />, <br /> <br />EXHIBIT B <br />