My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2691
Clerk
>
Ordinances
>
2000 - 2010 (NS-2416-2812)
>
2005 (NS-2674 - NS-2706)
>
NS-2691
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:01:04 PM
Creation date
7/28/2005 12:28:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2691
Date
7/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />replacement improvements. <br />e. Window specifications shall be established pursuant to paragraph 4 of this <br />Agreement. <br /> <br />3. Taft Elementary Loading Zone <br />a. Nexus shaH construct all improvements necessary to effectuate Definitive <br />Easement Agreement between Santa Ana Unified School District, Nexus and <br />South Coast Church. <br />b. Improvements to loading zone shall include driveway approaches, traffic lanes on <br />site, striping, church building renovations, portable classroom relocations, <br />computer lab on school and church properties, etc. as provided for in plans <br />included as part of Definitive Easement Agreement. <br /> <br />4. Pay City $200,000 for City to implement a Neighborhood Traffic Management <br />Plan ("NTMP") to mitigate changes in traffic patterns or increased cut through <br />traffic resulting from the Nexus and Geneva Commons Projects in the Sandpointe <br />Neighborhood. NTMP costs shall include traffic studies, staff time to process <br />neighborhood traffic plan, and the construction of appropriate traffic calming <br />devices, including but not limited to semi-diverters, diagonal diverters, and street <br />closures. The implementation of the NTMP shall be pursuant to procedures <br />adopted by the City Council. <br /> <br />5. Nexus shall pay the City the full cost (see Exhibit B) for the installation of a <br />Traffic Signal at the intersection of MacArthur Boulevard and Birch Street. <br /> <br />PnhJicly_Ownpil Irnprovp.mp.nh: <br /> <br />I Utility Undergrounding <br />a. Main Street - MacArthur to Sunflower <br />b. MacArthur - Main to Flower <br />c. Sunflower - Main to Flower (north side of street) <br /> <br />1Ii <br /> <br />Ordinance NS-2691 <br />Page 54 of 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.