Laserfiche WebLink
<br />", <br /> <br />proposed date of construction. To the full extent of Paragraph 4 above (Indemnification), Contractor <br />agrees to indemnify SCRRA against any and all claims resulting from sickness or any other absence. <br />SCRRA will charge the Contractor four hours minimum for services four hours or less in duration. The <br />Contractor will be charged for an entire eight-hour day if the Contractor cancels SCRRA services after the <br />SCRRA Railroad Employee is on the site on the day of the appointment. <br /> <br />12. Reimbursement of Costs and Expenditures <br /> <br />The Contractor agrees to reimburse SCRRA or Member Agency for all cost and expense incurred by <br />SCRRA or Member Agency in connection with said work, including without limitation the expense of <br />engineering plan review, staff costs to process approvals and agreements, furnishing an SCRRA Railroad <br />Employee, and protective services as SCRRA deems necessary. Contractor agrees to reimburse SCRRA <br />for all construction related services including but not limited to installation and removal of falsework <br />beneath tracks, restoration of railroad roadbed and tracks, installation of appropriate protective devices, <br />temporary and permanent repairs of signal or communication equipment, restoration of the Right of Way <br />to a condition satisfactory to SCRRA's and Member Agency's representative. <br /> <br />The Contractor agrees to reimburse SCRRA or Member Agency actual cost and expense reasonably <br />incurred for all services and work performed in connection with said work, including SCRRA's allocated <br />overhead and fringe benefits. SCRRA will charge the Contractor for eight hours minimum if the <br />Contractor cancels SCRRA services after SCRRA Railroad Employee is on site on the day of the <br />appointment. <br /> <br />The Contractor also agrees to reimburse SCRRA, Member Agency andlor Operating Railroad for any and <br />all cost and expense incurred as a result of Contractor's work which may result in (i) unscheduled delay to <br />the trains or interference in any manner with the operation of trains, (ii) unscheduled disruption to normal <br />train operation, (iii) unreasonable inconvenience to the public or private user of the system, (iv) loss of <br />revenue, and (v) alternative method of transportation for passengers. SCRRA will submit final bills to the <br />Contractor for cost incurred. <br /> <br />Prior to commencement of work, the Contractor shall deposit with SCRRA the sum of <br />dollars ($) representing the estimated expense to be incurred by SCRRA and Member <br />Agency in connection with said work. As the work progresses, SCRRA may require additional progress <br />payments as the scope of work changes or becomes clearer. SCRRA may discontinue services to <br />Contractor pending receipt of progress payments. The deposit and progress payments shall be applied to <br />SCRRA's and Member Agency's actual costs and expenditures. The Contractor shall be responsible to pay <br />any amount exceeding the above payments upon receipt of notice or invoice by SCRRA. SCRRA shall <br />exercise its best efforts to provide final invoicing to Contractor within 90 days following completion of <br />the work; however, Contractor acknowledges that it shall be responsible for payment of all expenses <br />incurred by SCRRA and Member Agency in connection with the work even if the final invoicing is <br />provided to Contractor thereafter. Upon satisfactory completion of all work, any payments in excess of <br />SCRRA's and Member Agency's costs and expenditures shall be returned to the Contractor within <br />reasonable time. <br /> <br />I f there is no amount indicated in the blank space provided above for the deposit to be made by the <br />Contractor, and if prior SCRRA written approval is obtained, in lieu of such deposit, Contractor shall <br />cause surety bond to be executed by a reliable surety acceptable to SCRRA and Member Agency, <br />conditioned upon the faithful performance of the provisions of this Agreement. <br /> <br />13. Temporarv Traffic Control <br /> <br />Temporary traffic control shall be used when a maintenance or construction activity is located on the <br />Right of Way or when the activity is located in the vicinity of a highway-rail grade crossing, which could <br />result in queuing of vehicles across the railroad tracks. Refer to SCRRA's "Temporary Traffic Control <br /> <br />seRRA FORM NO_ 6 <br /> <br />Page 5 of 12 <br /> <br />7/] 2/2004 <br />