Laserfiche WebLink
<br />. <br />... ...., <br /> <br />or damaged by the Contractor or its subcontractors) and (c) remove all of the Contractor's <br />and its subcontractors' tools, equipment and materials from the Property promptly upon <br />completion of work. <br /> <br />4.7.2 Upon receipt of the Contractor's written assertion that the work has been completed, the <br />work will be inspected by SCRRA for acceptance. All work shall be guaranteed by the <br />Contractor against defective workmanship and material furnished by the Contractor for a <br />period of one (I) year from the date the work was accepted by SCRRA. <br /> <br />SCRRA/Metrolink <br />FORM37 <br /> <br />Page 9 <br /> <br />OS/27/04 <br />