My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PACIFIC PROPERTIES 1-1990
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PACIFIC PROPERTIES 1-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:54 PM
Creation date
9/6/2005 11:32:53 AM
Metadata
Fields
Template:
Contracts
Company Name
California Pacific Properties
Contract #
A-1990-102
Agency
Planning & Building
Council Approval Date
10/1/1990
Expiration Date
12/31/2025
Destruction Year
2030
Notes
Amended A-2005-195, See file for further documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />," <br /> <br />DRAJ.l (August 7, 1990) <br /> <br />TRAFFIClCIRCUlA TlON <br /> <br />18. With the first building permit for the proposed project, the project applicant shall <br />construct a traffic signal at the intersection of Susan StreetlSunflower Avenue in <br />accordance with standard traffic signal warrants. Under the terms of a pending <br />reimbursement agreement between the cities of Santa Ana and Costa Mesa, the <br />project applicant shall install, and provide initial costs for, this traffic signal but shall <br />eventually be reimbursed for all but the "fair share" of the signal costs associated with <br />the proposed Lake Center project. <br /> <br />Timin\, of ImplementationNerification: <br /> <br />Concurrent with first building permit <br />construction <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br />Verification (Name & Date): <br /> <br />Manager, Engineering Services <br /> <br />19. The project applicant shall install multiway (4-way) 'stop" signage at the intersection <br />of Lake Center and Susan Street. <br /> <br />Timin~ of ImvlementationNerification: <br /> <br />Prior to first building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br /> <br />Verification (Name & Dale): <br /> <br />20. The project applicant shall post a faithful performance bond for the future installation <br />of a traffic signal at Lake Center and MacArthur Boulevard. This intersection shall <br />be monitored as the project is constructed for satisfaction of signal warrant <br />requirements and the signal shall be installed as warranted. <br /> <br />Timin~ of ImplementationNerification: Prior to grading permit issuance <br /> <br />Method of Verification: Written evidence provided by applicant <br /> <br />Re~ponsible Parties: Sr. Plan Check Engineer. Building Division <br />. & Manager, Engineer Services <br /> <br />Verification (Name & Dale): <br /> <br />885MMP <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.