of Santa Ana Exhibit C -3 Statement of Work <br />1.4 Site Survey /Site Preparation <br />In order to ensure the computer room(s) and other locations are appropriate for the <br />installation of the system hardware, a survey of the Customer's facilities will be <br />conducted. <br />1.4.1 Motorola Responsibilities <br />a. Conduct a site survey /audit of the facilities in which system hardware will be <br />installed to assess site readiness. <br />b. Prepare a report that includes recommendations for any site preparation required to <br />provide a suitable environment for installation of the system equipment. <br />c. Advise the Customer of any deficiencies related to power, power supplies, cabling, <br />network connectivity, communications equipment that are identified. <br />1.4.2 Customer Responsibilities <br />a. Provide a site adequate for the installation, operation, and maintenance of all <br />computer server(s), workstation(s), and related peripheral equipment. The space <br />provided for the equipment cabinet will be adjacent to and in line with the <br />computer equipment cabinets. Space will be provided in the front and rear <br />(minimum 36" in front and rear) of all cabinets to allow room for installation and <br />maintenance of components and wiring. These facilities will be made available at <br />least two (2) weeks prior to the scheduled installation dates to allow for timely <br />installation. <br />b. Provide appropriate power and power distribution units in each equipment room. <br />Power will be generator- backed, auto - switching, with frequency and voltage <br />consistent and stable to within defined limits of the UPS selected. AC power is to <br />be generator - backed, UPS power with minimum two -state EMP protection. <br />Provide all generators and first two -stage EMP protection. <br />c. Provide surge protected AC power strips for each workstation. Provide one <br />standard AC power outlet (grounded) within four cable feet of the monitors and <br />system unit located within each console. Each position should be on a separate <br />breaker to limit the number of positions affected by the loss of a single circuit. <br />Power requirements for the largest three- monitor console position is 1,500 watts, <br />inductive. No more than 3 consoles should share the same circuit to minimize the <br />number of workstations affected by individual breaker activation. <br />d. Provide a minimum of one 15 -amp grounded AC power outlet in each office space <br />that requires the placement of workstations and/or printers. Each terminal requires <br />700 watts inductive and each printer requires 500 watts inductive. <br />Exhibit C -3, Statement of Work Page C3 - 5 0512/05 <br />CN: 05 -17505 <br />This document contains Motorola and Motorola confidential, proprietary, and trade secret information and may not be shared with any <br />person or agency not directly associated with the city of Santa Ana without the express written consent of Motorola, Inc., or its <br />designees. <br />