completion of the Acceptance Tests, System Acceptance will be deemed to have occurred as of <br />the completion of the Acceptance Tests. Minor omissions or variances in the System that do not <br />materially impair the operation of the System as a whole will not postpone System Acceptance <br />or Subsystem acceptance, but will be corrected according to a mutually agreed schedule. <br />8.3. BENEFICIAL USE. Customer acknowledges that Motorola's ability to perform its <br />implementation and testing responsibilities may be impeded if Customer begins using the System <br />before System Acceptance. Therefore, Customer will not commence Beneficial Use before <br />System Acceptance without Motorola's prior written authorization, which will not be <br />unreasonably withheld. Motorola is not responsible for System performance deficiencies that <br />occur during unauthorized Beneficial Use. Upon commencement of Beneficial Use, Customer <br />assumes responsibility for the use and operation of the System. <br />8.4 FINAL PROJECT ACCEPTANCE. Final Project Acceptance will occur after System <br />Acceptance when all deliverables and other work have been completed. When Final Project <br />Acceptance occurs, the parties will promptly memorialize this final event by so indicating on the <br />System Acceptance Certificate. <br />Section 9 REPRESENTATIONS AND WARRANTIES <br />9.1. SYSTEM FUNCTIONALITY. Motorola represents that the System will perform in <br />accordance with the Specifications in all material respects. Upon System Acceptance or <br />Beneficial Use, whichever occurs first, this System functionality representation is fulfilled. <br />Motorola is not responsible for System performance deficiencies that are caused by ancillary <br />equipment not furnished by Motorola which is attached to or used in connection with the System <br />or for reasons or parties beyond Motorola's control, such as natural causes; the construction of a <br />building that adversely affects the microwave path reliability or radio frequency (RF) coverage; <br />the addition of frequencies at System sites that cause RF interference or intermodulation; or <br />Customer changes to load usage or configuration outside the Specifications. <br />9.2. EQUIPMENT WARRANTY. During the Warranty Period, Motorola warrants that the <br />Equipment under normal use and service will be free from material defects in materials and <br />workmanship. If System Acceptance is delayed beyond six (6) months after shipment of the <br />Equipment by events or causes within Customer's control, this warranty expires eighteen (18) <br />months after the shipment of the Equipment. <br />9.3. MOTOROLA SOFTWARE WARRANTY. Unless otherwise stated in the Software <br />License Agreement, during the Warranty Period, Motorola warrants the Motorola Software in <br />accordance with the terns of the Software License Agreement and the provisions of this Section <br />9 that are applicable to the Motorola Software. If System Acceptance is delayed beyond six (6) <br />months after shipment of the Motorola Software by events or causes within Customer's control, <br />this warranty expires eighteen (18) months after the shipment of the Motorola Software. <br />9.4. EXCLUSIONS TO EQUIPMENT AND MOTOROLA SOFTWARE WARRANTIES. <br />These warranties do not apply to: (i) defects or damage resulting from: use of the Equipment or <br />Motorola Software in other than its normal, customary, and authorized manner; accident, liquids, <br />neglect, or acts of God; testing, maintenance, disassembly, repair, installation, alteration, <br />modification, or adjustment not provided or authorized in writing by Motorola; Customer's <br />Santa Ana, CSA Pape 8 May 2, 2005 <br />Motorola Contract No. 05-17505 <br />