My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-049 Not Adopted
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-049 Not Adopted
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:05 PM
Creation date
9/12/2005 12:22:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-049
Notes
Not Adopted
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Conditions for Approval for Conditional Use Permit No. 2004-23 <br /> <br />Conditional Use Permit No. 2004-23 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. <br /> <br />The applicants must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this conditional use permit. <br /> <br />The applicants must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br /> <br />A. PlanninQ Division <br /> <br />1. The applicants must comply with all conditions and requirements of the <br />Development Review Committee for the development project (DP No. 04- <br />055). <br /> <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At that time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />amended. <br /> <br />3. The current grove of Canary Island Pines and Mexican Fan Palms and <br />vines around the equipment area shall be maintained in good order over the <br />life of the conditional use permit. In addition, new vines will be added to the <br />leased equipment area and be maintained by AT&T. <br /> <br />4. The permit applicants recognize that the frequencies used by the cellular <br />facility located at 28100/. South Flower Street are extremely close to the <br />frequencies used by the City of Santa Ana for Public Safety. This <br />proximity will require extraordinary "comprehensive advanced planning <br />and frequency coordination" engineering measures to prevent <br />interference, especially in the choice of frequencies and radio ancillary <br />hardware. This is encouraged in the "Best Practices Guide" published by <br />the Association of Public-Safety Communications Officials-International, <br />Incorporated (APCO), and as endorsed by the Federal Communications <br />Commission (FCC). Prior to the issuance of any permits to install the <br />facility, (Permit Applicant) shall meet in good faith to coordinate the use of <br />frequencies and equipment with the Communications Division of the <br />Orange County Sheriff-Coroner Department to minimize, to the greatest <br />extent possible, any interference with the Public Safety 800 MHz <br />Countywide Coordinated Communications System (CCCS). Similar <br /> <br />EXHIBIT "An <br />Page 1 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.