My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECONOLITE TRAFFIC ENGINEERING 1 -2005
Clerk
>
Contracts / Agreements
>
E
>
ECONOLITE TRAFFIC ENGINEERING 1 -2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 11:50:22 AM
Creation date
9/23/2005 3:14:55 PM
Metadata
Fields
Template:
Contracts
Company Name
Team Econolite
Contract #
A-2005-200
Agency
Public Works
Council Approval Date
8/1/2005
Expiration Date
8/31/2008
Insurance Exp Date
4/27/2009
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />I <br /> CITY OF SANTA ANA <br />I STearn ROLLING REPORT <br /> conolit;e <br />TI'IIffic~..-dtvlor"~,ho. March 2005 <br />I TOTAL TOTAL <br />DATE ID INTERSECTION WORK DESCRIPTION RATE CHARGE CHARGE MATERIAL <br />I 10/31/04 101-017 Bristol @ MacArthur @ <br /> DR 9148 Problem: UT R 2 B - Not Verified <br /> Work Performed: Walked/Monitored Location - Verified Ops - CD to <br /> F/Up & check wiring - No problem found <br />I Time & Tech: 1.5/HR - DT - JS <br /> Material: $0.00 $0.00 $0.00 <br />I Labor: 1.5/HR - OT $116.05 $174.08 $174.08 <br /> Equipment: Service Vehicle $35.63 $35.63 $35.63 <br /> 01/04/05 CREDIT Victoria @ 19th Costa Mesa Location @ <br />I DR 9460 Problem: Check Street Light Pole - No Problem Found <br /> Work Performed: No damage found - Not Verified <br /> Time & Tech: 1.5/HR - 5T - FO <br />I Material: $0.00 $0.00 $0.00 <br /> Labor: 1.5/HR - ST -$55.68 -$83.52 -$83.52 <br /> Equipment: Service Vehicle -$35.63 -$35.63 -$35.63 <br />I 02/08/05 CREDIT 1115 Birch Street Street Lighting @ <br /> DR 7800 Problem: Broke white globe while changing lamp <br /> Work Performed: Replaced White Globe <br />, Time & Tech: .25/HR - 5T - AL <br />I Material: White Globe $0.00 $0.00 $0.00 <br />I Labor: .25/HR - 5T $0.00 $0.00 $0.00 <br /> Equipment: Service Vehicle $0.00 $0.00 $0.00 <br />02/15/05 CREDIT 3100 Greenville Street Lighting @ <br />(\ DR11255 Problem: Pole X'd due to accident ~ Verified <br /> Work Performed: SCE Pole X'd - SCE on site <br /> Time & Tech: 1.5/HR - OT - JS <br /> Material: $0.00 $0.00 $0.00 <br /> Labor: 1 .5/HR - OT -$116.05 -$174.08 -$174.08 <br /> Equipment: Service Vehicle -$35.63 -$35.63 -$35.63 <br /> 02/28/05 101-094 Golden Circle @ First @ <br /> DR 11308 Problem: Location "8" - Verified - No power to cabinet - <br /> Found breaker @ Service tripped <br /> Work Performed: Reset breaker - Power back on - Check Timing & <br /> Reset lIS - Verify Ops - OK <br /> Time & Tech: .5/HR - 5T - CD <br /> Material: $0.00 $0.00 $000 <br /> Labor: .5/HR - ST $55.68 $27.84 $27.84 <br /> Equipment: Service Vehicle $35.63 $35.63 $35.63 <br /> <br /> <br />Page 1 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.